My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SEQUOIA
>
500
>
2900 - Site Mitigation Program
>
PR0505768
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2020 9:40:24 AM
Creation date
5/13/2020 2:04:42 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0505768
PE
2960
FACILITY_ID
FA0006988
FACILITY_NAME
ALDEN PARK CHEVRON
STREET_NUMBER
500
Direction
N
STREET_NAME
SEQUOIA
STREET_TYPE
AVE
City
TRACY
Zip
95376
APN
23416001
CURRENT_STATUS
01
SITE_LOCATION
500 N SEQUOIA AVE
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\fgarciaruiz
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
462
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chevron <br /> E INVNON;b'ffl ALREALIE1 ; Chevron <br /> rrT` ;;T SERME <br /> 95 JUL 13 PM 4: 19 <br /> July 12, 1995 Chevron Pipe Line Company <br /> 4000 Executive Parkway,Suite 400 <br /> San Ramon,CA 94583 <br /> P.O.Box 5059 <br /> Mr. David Jenkins San Ramon,CA 945810959 <br /> California Regional Water Quality Control Board 0.o.Culbertson <br /> Central Valley Region Site Remediation Specialist <br /> California Environmental Protection Agency (5101842-6930 <br /> 3443 Routier Road, Suite A <br /> Sacramento, California 95927-3098 <br /> Revised Work Plan for Additional Site Characterization <br /> Alden Park Site <br /> Tracy, California - <br /> Dear Mr. Jenkins: <br /> Please find attached Geomatrix Consultants Inc.'s (Geomatrix) response(dated July 5, 1995)to <br /> your letter of April 21, 1995 and the Department of Toxic Substance Control (DTSC) <br /> memorandum of April 11, 1995. Geomatrix's letter was prepared on behalf of Chevron Pipe Line <br /> Company (CPL)to respond to comments on their Revised Work Plan for Additional Site <br /> Characterization, Alden Park, Tracy, California, dated January 31, 1995. As described in <br /> Geomatrix's letter, all accessible wells suitable for sampling will be sampled, additional soil <br /> sampling will be performed on residential lots as indicated, and soil samples will be archived for <br /> future reference. <br /> A town hall meeting is tentatively scheduled for the second week in August at the Villa Lovos <br /> Elementary School, located in Tracy California. Your presence at this meeting would be an asset <br /> to the project as a whole. I will forward more specific information as it becomes available. <br /> Contact Mr. Martin Bloes (510/842-6855) or me(510/842-6930) with any remarks or questions. <br /> Sincerely, <br /> J Do O. Culbertson <br /> M :lw <br /> T B0117.DOC <br /> Attachment <br /> cc: Greg Brorby -Geomatrix Consultants/San Francisco <br /> Ned Butler-DTSC <br /> Fred Diaz-City of Tracy <br /> Mike Infurna- San Joaquin County Public Health Services <br /> Jill Jefferson - Geomatrix Consultants/Fresno <br /> Sam Singer- Kamer - Singer&Associates/San Francisco <br />
The URL can be used to link to this page
Your browser does not support the video tag.