My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SEQUOIA
>
500
>
2900 - Site Mitigation Program
>
PR0505768
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2020 9:40:24 AM
Creation date
5/13/2020 2:04:42 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0505768
PE
2960
FACILITY_ID
FA0006988
FACILITY_NAME
ALDEN PARK CHEVRON
STREET_NUMBER
500
Direction
N
STREET_NAME
SEQUOIA
STREET_TYPE
AVE
City
TRACY
Zip
95376
APN
23416001
CURRENT_STATUS
01
SITE_LOCATION
500 N SEQUOIA AVE
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\fgarciaruiz
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
462
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • �//�/ <br /> Civic Center Square <br /> 2444 Main Street, Suite 215 <br /> Fresno, California 93721-2734 <br /> (209) 264-2535 • FAX(209) 264-7431 R E C Ep I V,.,.� GEOMATRIX <br /> 5 July 1995 JUL 1 © 1995 <br /> Project C2657 <br /> D.O. CULbtzri i SON <br /> CHEVRON PIPE LINE CO. <br /> Mr. Don O. Culbertson <br /> Chevron Pipe Line Company <br /> P.O. Box 5059 <br /> San Ramon, California 94583-0959 <br /> Subject: Response to 21 April 1995 RWQCB Letter <br /> Alden Park <br /> Tracy, California <br /> Dear Mr. Culbertson: <br /> This letter provides a response to the 21 April 1995 letter from Mr. David Jenkins of the California <br /> Regional Water Quality Control Board—Central Valley Region(RWQCB)regarding the 31 January 1995 <br /> "Revised Work Plan for Additional Site Characterization, Alden Park, Tracy, California" prepared by <br /> Geomatrix Consultants, Inc. (Geomatrix) on behalf of Chevron Pipe Line Company (CPL). Enclosed <br /> with the 21 April 1995 RWQCB letter was an 11 April 1995 memorandum from Dr. Ned Butter of the <br /> State of California Environmental Protection Agency—Department of Toxic Substances Control(DTSC) <br /> to Mr. Jenkins. The DTSC is providing consulting services in risk assessment to the RWQCB for the <br /> Alden Park site to support the regulatory efforts of the RWQCB. The 21 April 1995 letter and 11 April <br /> 1995 memorandum contain comments that require a response; each specific comment and Geomatrix's <br /> response to the commeist are presented below. <br /> 1. Also, as far as the groundwater sampling is concerned,please explain why you propose to sample <br /> only 10 of the 18 monitoring wells. <br /> Eighteen wells(MWl-KJC and MW-1 through MW-17) have been installed at the site. At the time the <br /> revised work plan was prepared, only 10 of the 18 wells were available for groundwater monitoring for <br /> petroleum hydrocarbon constituents for the following reasons: <br /> • Separate-phase hydrocarbon has accumulated on the groundwater surface inside the casing <br /> of wells MW-1, MW-3, MW-15 and MW-16. <br /> • Well MW-6 is not accessible for groundwater sampling because of bioventing equipment. <br /> • Groundwater monitoring wells MWl-KJC,MW-4, and MW-8 cannot be located. Chevron <br /> is currently attempting to locate these wells; if the wells are found and are not damaged, <br /> they will be sampled. If damaged, they will be properly destroyed. <br /> Geomatrix Consultants, Inc. <br /> Engineers,Geologists,and Environmental Scientists <br />
The URL can be used to link to this page
Your browser does not support the video tag.