Laserfiche WebLink
David Jenkins <br /> 4/12/95 <br /> Page 2 <br /> the absence of a contract, this document was not reviewed until <br /> after the March 28 meeting. This document will be referred to <br /> as the "site characterization work plan" and is the subject of <br /> this memo. <br /> Scope of Review <br /> The site characterization work plan was reviewed for <br /> scientific content. Minor grammatical or typographical errors <br /> that do not affect the interpretation have not been noted. <br /> However, these should be corrected in the final version of the <br /> Cment . <br /> ral Comments <br /> rding to this workplan, the site was used for storage of <br /> motive fuel in a large, concrete-lined, in-ground reservoir <br /> the late 20' s to the late 50' s. The reservoir was shut <br /> and the concrete edges of the reservoir were pushed in and <br /> remainder of the reservoir was covered with fill material. <br /> ing was subsequently built on the "edges" of the old <br /> rvoir and a circular park was located on top of the <br /> rvoir. Tar deeps have been observed at the site over the <br /> several years. CPL would like a risk assessment to be <br /> ucted to determine whether or not a human health risk is <br /> d b the petroleum contamination. Constituents of <br /> peterole have been detected in samples from ground water <br /> mons or <br /> wells. GM is proposing a sampling plan to determine <br /> the concentrations in the soil for the risk assessment . <br /> Specific Comments <br /> 1. Populations And Pathways Of Potential Concern <br /> The conceptual model for the risk assessment (Fig. 6) <br /> appears to include the likely populations and relevant pathways <br /> for this site. <br />