Laserfiche WebLink
$T2.TE <br /> DEPAORAGEhY PETE VAI SON rFTMOOCUANES <br /> CONTROL <br /> ROL <br /> 400 P Street <br /> P.O. Box 806 <br /> Sacramento,CA 95812-0806 <br /> Voice: (916)323.3751 �- <br /> Fax: (916)327-2509 _- <br /> MEMORANDUM <br /> TO: David Jenkins <br /> Associate Engineering Geologist <br /> 3443 Routier Road, Suite A <br /> Sacramento, CA 95827-3098 <br /> FROM: Ned Butler, Ph.D, DABT �� %G <br /> Staff Toxicologist <br /> Office of Scientific Affairs (OSA) <br /> Human and Ecological Risk Section (HERS) <br /> DATE: April 11, 1995 <br /> SUBJECT: Review of Alden Park, Tracy CA a - <br /> Outcome:02 PCA:12185 Site: 900018-00 <br /> Background <br /> The Department of Toxic Substances Control (DTSC) is <br /> providing consultative services in risk assessment for the ry <br /> Alden Park Site n Tracy CA to support the regulatory effortsw <br /> of the Central Valley Regional Water Quality Control Board <br /> (CVRWQCB) . These services pertain to potential human health <br /> effects of contaminated soil this site. Geomatrix Consultants <br /> (GM) has been retained by Chevron Pipeline Company(CPL) to <br /> assist in the risk assessment of this sites . On March 28, <br /> 1995, a meeting was held at CVRWQCB office on Routier Road. <br /> Those in attendance where Stephen Dizio (DTSC) , David Jenkins <br /> (CVRWQCB) , Ned Butler (DTSC) , Bob Matteoli (CVRWQCB) Don <br /> Culbertson (CPL) , Pat Hughes (CPL) , Bill Pipes (GM) , Jill <br /> Jefferson (GM) , Greg Borby (GM) and Martin Bloes (GM) . At that <br /> meeting, representatives of GM and CPL presented the history of <br /> the site, present objectives of the project and details of the <br /> Work Plan for Additional Site Characterization. <br /> Document Reviewed <br /> The draft document "Revised Work Plan for Additional Site <br /> Characterization, Alden Park, Tracy California, 31 January <br /> 1995" was received in our office on February 1, 1995 . Due to <br />