Laserfiche WebLink
YFNT NOTES: <br /> 6 1. SAFETY CONTROLS WILL SHUT DOWN <br /> DOWN PUMP IF: <br /> DEMISTER S (A1 VACUUM EXCEEDS 70 INCHES <br /> WATER. <br /> (81 PRESSURE IN CARBON EXCEEDS <br /> 30 INCHES MATER. <br /> VACUUM AIR/WATER UC) WATER SUPPLY TO PUMP IS <br /> PUMP SEPARATOR (C8DO LB ARBON INTERRUPTED. <br /> DRUM IDI ELECTRICAL POWER IS <br /> 77/72 3 INTERRUPTED. • <br /> FND <br /> 1 FLOW 2. O DENOTES SAMPLE PORT. <br /> METER <br /> S PORT S S <br /> (NOTE 21 4 5 <br /> WATER <br /> DEMISTER TO <br /> SEWER <br /> MATER <br /> PRESSURE Nv <br /> GAUGE <br /> PORT <br /> g <br /> STREAM NUMBER 1 2 3 4 5 6 <br /> $€ <br /> u SOIL WATER WATER <br /> VENT RIR TOTAL TO FROM TREATED <br /> STREAM NAME GAS BLEED CRS PUMP SEPARATOR RIR <br /> FLOW, CFM 20-150 160-30 180 180 <br /> I FLOW. GPM - - - 4 4 - <br />` HYDROCARBON. PPM -3DO - 30-300 - - <10 <br /> (EXCLUDING METHANE] <br /> g OIL AND GREASE. PPM - - - - X50 - <br /> TEMPERATURE. •F SO-70 40-BO 40-80 60-70 60-70 60-70 <br /> 1 VACUUM. INCHES H 0 70-0 70-070-0 <br /> '! PRESSURE. PSIG25-1251 0-1 1 0 <br /> F_ REVISIONS - - <br /> SCALE NONEDATE 12/08/87 aI ial CHEVRON CORPORATION PROCESS FLOW DIAGRAM <br /> ENGINEERING TECHNOLOGY DEPT. <br />)$ oR AMF cH ENG. Him TECHNICAL SERVICES TRACY BIOVENTING TEST <br /> ENVIRONMENTAL DIV. <br /> s.o.623S2 IRC 875242REvlslaN <br />