My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SEQUOIA
>
500
>
2900 - Site Mitigation Program
>
PR0505768
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2020 9:40:24 AM
Creation date
5/13/2020 2:04:42 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0505768
PE
2960
FACILITY_ID
FA0006988
FACILITY_NAME
ALDEN PARK CHEVRON
STREET_NUMBER
500
Direction
N
STREET_NAME
SEQUOIA
STREET_TYPE
AVE
City
TRACY
Zip
95376
APN
23416001
CURRENT_STATUS
01
SITE_LOCATION
500 N SEQUOIA AVE
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\fgarciaruiz
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
462
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PP <br /> Chevron • <br /> Chevron Pipe Line Company Tracy, California <br /> 555 Market Street, San Francisco, California January 28, 1988 <br /> Mail Address: P.O.Box 7141,San Francisco,CA 94120-7141 <br /> ALDEN PARK NEWSLETTER #7 <br /> Dear Alden Park Area Residents: <br /> This newsletter is to inform you of work that is ready to begin in <br /> and around Alden Park. <br /> Pumping Test - We will be pumping some water and oil from below <br /> the park beginning the week of January 25. A trailer will house <br /> equipment as shown below. This test will last for two weeks and <br /> determine if much of the oil below the park can be removed by <br /> pumping. <br /> Soil Venting Test - We will construct a test facility to draw air <br /> through the ground north of Alden Park. This technique, known as <br /> "soil venting" , removes oil using biodegradation. The temporary <br /> test facility will be a small block building, and construction <br /> should be completed in late March. The test will last for about <br /> 10 weeks. <br /> PUMPING TEST SOIL VENTING TEST <br /> (2 Weeks) (10 Weeks) <br /> :now <br /> KLM7ck <br /> - <br /> r <br /> 7 p <br /> Tree Planting - We will be planting six trees in Alden Park to <br /> replace trees chat have died. Tree problems in the park may be <br /> caused by an underground concrete slab that limits drainage and/or <br /> by oil in the soil . We will be drilling holes through the con- <br /> crete slab, therefore you might see some heavy equipment in the <br /> area. Tree planting will take 2-4 weeks. <br /> If you have any questions or concerns please call me collect at <br /> (415) 894-9320 . <br /> Very Truly Yours, <br /> M a,ty (f. /X <br /> Mary E. Metcalf <br /> Coordinator - Environmental, <br /> Safety, Fire & Health <br /> cc: Tracy, City Manager, Michael Locke <br /> Department of Health Services - Chuck McLaughlin <br /> Regional Water Quality Control Board - David Brent <br /> Local County Health - Dave Carls, Seyed Sadredin <br />
The URL can be used to link to this page
Your browser does not support the video tag.