My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SEQUOIA
>
500
>
2900 - Site Mitigation Program
>
PR0505768
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2020 2:53:39 PM
Creation date
5/13/2020 2:07:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0505768
PE
2960
FACILITY_ID
FA0006988
FACILITY_NAME
ALDEN PARK CHEVRON
STREET_NUMBER
500
Direction
N
STREET_NAME
SEQUOIA
STREET_TYPE
AVE
City
TRACY
Zip
95376
APN
23416001
CURRENT_STATUS
01
SITE_LOCATION
500 N SEQUOIA AVE
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br /> -s- <br /> organic vapors as described in the subsequent section on <br /> health and safety. Excavated dirt will be placed on plas- <br /> tic sheets or in covered trucks . It will be removed by <br /> Chevron the same day. <br /> Excavations will be backfilled and resurfaced appropri- <br /> ately. This includes repaving disrupted streets and side- <br /> walks and replacing sod. <br /> All work will be carried out as expediently as possible to mini- <br /> mize disruptions in this residential area. Any excavations that <br /> must be left overnight will be covered with a heavy steel <br /> plate . Traffic on Palm Circle will be reduced to one lane while <br /> work on that seep is taking place. <br /> Health and Safety Precautions <br /> All work at the site will be carried out in accordance with <br /> health and safety plans prepared by the contractor performing the <br /> task . The plans will be similar in scope to the plan submitted <br /> in Appendix B, which is an amended version of the Health and <br /> Safety Plan submitted with our previous Work Plan. All plans <br /> will be reviewed by Chevron for their completeness . Contractor ' s <br /> personnel will be expected to carry out all provisions of their <br /> health and safety plan. Failure to do so will be sufficient <br /> cause for Chevron or the city of Tracy to suspend work at the <br /> site until provisions are met . <br /> All excavations will be monitored for hydrocarbon vapors with <br /> Drager tubes or similar device to detect hydrocarbon vapors and <br /> identify conditions that require respiratory equipment. Based on <br /> the site assessment by Dames and Moore and our excavation work <br /> under the previous Work Plan, we do not expect to encounter con- <br /> centrations of hydrocarbon vapors above 200 ppm. If high concen- <br /> trations of hydrocarbons are detected, then adequate respiratory <br /> protection will be required as detailed in Appendix B. <br /> Proper clothing will be required for all on-site personnel to <br /> prevent transfer of oily material off-site. Proper clothing <br /> includes coveralls, gloves, boots, safety glasses, etc. , when <br /> appropriate. Proper care will be taken when leaving the site to <br /> prevent the transfer of oil to clean areas . <br /> Emergencies, Complaints, Concerns <br /> The purpose of this section is to list the responsible parties <br /> that should be contacted in the event of an emergency at the <br /> site. Chevron ' s contacts should also be notified of any general <br /> problems arising from our work (e.g. , excessive noise, odors, <br /> unnecessary disruption of traffic, etc. ) . <br />
The URL can be used to link to this page
Your browser does not support the video tag.