My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SEQUOIA
>
500
>
2900 - Site Mitigation Program
>
PR0505768
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2020 2:53:39 PM
Creation date
5/13/2020 2:07:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0505768
PE
2960
FACILITY_ID
FA0006988
FACILITY_NAME
ALDEN PARK CHEVRON
STREET_NUMBER
500
Direction
N
STREET_NAME
SEQUOIA
STREET_TYPE
AVE
City
TRACY
Zip
95376
APN
23416001
CURRENT_STATUS
01
SITE_LOCATION
500 N SEQUOIA AVE
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-12- <br /> 6. Turn function switch to the 0-20 position (or to scale to <br /> accommodate calibration gas) . <br /> 7. For calibration of the instrument from the pressurized con- <br /> tainer, connect the valve (provided with the calibration kit) to <br /> the pressurized container of calibration, and convert the valve <br /> via Tygon tubing directly to the 8-in, extension to the photo- <br /> ionization probe. Crack the valve of the pressurized container <br /> until a slight flow is indicated on the gauge. The instrument <br /> draws in the volume of sample required for detection, and the <br /> flow in the rotometer indicates an excess of sample. Now adjust <br /> the span pot so that the instrument is reading the exact value of <br /> the calibration gas. ( If the instrument span setting is changed, <br /> the instrument should be turned back to the standby position and <br /> the electronic zero should be readjusted, if necessary. ) <br /> 8. Place probe in the atmosphere to be monitored. If the needle <br /> moves to the upper limit of the scale, change the function switch <br /> to the next position. <br /> 9 . 2 Organic Vapor Analyzer <br /> 9 . 2 .1 Startup <br /> 1. Move PUMP switch to ON and check battery condition by moving <br /> the INSTR switch to BATT position. <br /> 2. Move INSTR switch to ON and allow five ( 5) minutes for <br /> warmup. <br /> 3. Set alarm level adjust knob on back of readout assembly to <br /> desired level . <br /> 4. Set CALIBRATE switch to X10 position, use CALIBRATE knob, and <br /> set meter to read O. <br /> 5. Move PUMP switch to ON position, then place instrument panel <br /> in vertical position and check sample flow rate indication. <br /> 6. Open the H2 tank valve and the H2 supply valve. <br /> 7 . Depress igniter button until burner lights . Do not depress <br /> igniter button for more than six ( 6) seconds . ( If burner does <br /> not ignite, let instrument run for several minutes and again <br /> attempt ignition. ) <br /> 8. Use CALIBRATE knob to "zero" out ambient background. For <br /> maximum sensitivity below 10 ppm, set CALIBRATE switch X1 and <br /> readjust zero on meter . To avoid false flame-out alarm indica- <br /> tion, set meter to 1 ppm with CALIBRATE knob and make differen- <br /> tial readings from there. <br />
The URL can be used to link to this page
Your browser does not support the video tag.