My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SHAW
>
1265
>
2900 - Site Mitigation Program
>
PR0506292
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2020 1:01:08 PM
Creation date
5/13/2020 2:42:06 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506292
PE
2950
FACILITY_ID
FA0007328
FACILITY_NAME
EMPTY LOT
STREET_NUMBER
1265
Direction
N
STREET_NAME
SHAW
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
14327041
CURRENT_STATUS
02
SITE_LOCATION
1265 N SHAW RD
P_LOCATION
01
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
185
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
File No. 20-3937-01 hn KLEINFELDER <br /> September 3, 1996 <br /> 3 BACKGROUND <br /> Kleinfclder was contracted by Messrs. David Smith and Clark Taylor of Schaeffer Industries to <br /> conduct a Phase I Environmental Site Assessment per our February 27, 1996 proposal. That <br /> work was detailed in our Phase I Environmental Site Assessment Report dated April 17, 1996. <br /> In our report the following recommendations were made: <br /> 1. The installation. oh groundwater monitoring wells along the north east and south site <br /> boundaries in order to evaluate the potential threat to the proposed Schaeffer site due <br /> to offsite sources. <br /> 2. Asbestos was discovered along the Southern Terminal and Eastern Railroad tracks in <br /> the past. T.heretore;soil along the railroad tracks should be sampled for the presence <br /> of asbestos. <br /> Based on the recommendations made, Kleinielder was contracted by Schaeffer Industries to <br /> prepare a workplan (dated .lune 21, 1996) and cost estimate to conduct the additional <br /> assessment. The results of that assessment are detailed in this report. <br /> �A <br /> 20-3937-011MR960189 Page 6 of 18 01996, Kleinjelder,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.