Laserfiche WebLink
File No. 20-3937-01 hn KLEINFELDER <br /> September 3, 1996 <br /> 3 BACKGROUND <br /> Kleinfclder was contracted by Messrs. David Smith and Clark Taylor of Schaeffer Industries to <br /> conduct a Phase I Environmental Site Assessment per our February 27, 1996 proposal. That <br /> work was detailed in our Phase I Environmental Site Assessment Report dated April 17, 1996. <br /> In our report the following recommendations were made: <br /> 1. The installation. oh groundwater monitoring wells along the north east and south site <br /> boundaries in order to evaluate the potential threat to the proposed Schaeffer site due <br /> to offsite sources. <br /> 2. Asbestos was discovered along the Southern Terminal and Eastern Railroad tracks in <br /> the past. T.heretore;soil along the railroad tracks should be sampled for the presence <br /> of asbestos. <br /> Based on the recommendations made, Kleinielder was contracted by Schaeffer Industries to <br /> prepare a workplan (dated .lune 21, 1996) and cost estimate to conduct the additional <br /> assessment. The results of that assessment are detailed in this report. <br /> �A <br /> 20-3937-011MR960189 Page 6 of 18 01996, Kleinjelder,Inc. <br />