My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1045
>
2900 - Site Mitigation Program
>
PR0541799
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2020 3:43:38 PM
Creation date
5/13/2020 3:06:46 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0541799
PE
2960
FACILITY_ID
FA0023968
FACILITY_NAME
NOMELLINI CONSTRUCTION CO
STREET_NUMBER
1045
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16323040
CURRENT_STATUS
01
SITE_LOCATION
1045 W CHARTER WAY
P_LOCATION
01
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
August - September 2019 <br /> AGE-NC-Project No. 95-0121 <br /> Page 2 of 4 <br /> LOCATION: JOB FUNCTION: LEVELS OF PROTECTION: <br /> Exclusion Zone Drill borings A B C D Other <br /> Reduction Zone Preserve samples A B C D Other <br /> and log borings <br /> Support Zone Support functions A B C D Other <br /> Specific protective equipment for each level of protection used is follows: <br /> hard hat <br /> steel-toed boots <br /> half-faced respirator (if necessary) <br /> gloves <br /> Level D: safety glasses <br /> If air purifying respirators are authorized, organic vapor and dust is the appropriate <br /> canister for use with the involved substances and concentrations. No down-grading <br /> changes of the specified levels of protection shall be made without the approval of the <br /> site safety officer and the project team leader. <br /> 6.0. ON-SITE WORK PLANS <br /> Work party(ies) consisting of two persons will perform the following tasks: <br /> PROJECT TEAM LEADER: TASK: <br /> Timothy J. Cuellar Plan/Coordinate Drilling Event <br /> FIELD CREW: TASK: <br /> Rene Toth/ Keith Lindgren/ Rick Marty/ Install monitoring wells; gauge and <br /> Daniel Villavueva sample monitoring wells <br /> The works party(ies) shall be briefed on the content of this plan prior to initiating onsite <br /> work. <br /> 7.0. COMMUNICATION PROCEDURES <br /> If hearing is impaired, the following standard hand signals will be used: <br />
The URL can be used to link to this page
Your browser does not support the video tag.