My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1045
>
2900 - Site Mitigation Program
>
PR0541799
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2020 3:43:38 PM
Creation date
5/13/2020 3:06:46 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0541799
PE
2960
FACILITY_ID
FA0023968
FACILITY_NAME
NOMELLINI CONSTRUCTION CO
STREET_NUMBER
1045
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16323040
CURRENT_STATUS
01
SITE_LOCATION
1045 W CHARTER WAY
P_LOCATION
01
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EDMuNu C. Bnowr,Ja,.. <br /> l� 60vENNOR <br /> C A l 110 n n 1 A MATTMEw Roomou E"L <br /> 11 11�Tll <br /> � ater Board_ ENv HUNMERTDR�PRUTCCfIDA <br /> Central Valley Regional Water Quality Control Board <br /> 29 June 2018 <br /> Mr. Dante John Nomellini <br /> Nomellini Construction <br /> P.O. Box 1461 <br /> Stockton, CA 95201 <br /> Project Status, Nomellini Construction Company, 1045 West Charter Way, Stockton, <br /> San Joaquin County <br /> Central Valley Regional Water Quality Control Board (Central Valley Water Board) staff <br /> reviewed the following reports, all submitted on your behalf by Advanced GeoEnvironmental, <br /> Inc. (AGE): <br /> • the Soil-Vapor Investigation Report— First Quarter 2018 (Soil Gas Report) dated <br /> 2 April 2018, <br /> • the Groundwater Monitoring Report— Fourth Quarter 2097(4Q2017 Report) dated <br /> 27 March 2018, <br /> • the Soil Vapor Investigation Report dated 14 September 2017, <br /> • and the Monitoring Well Installation Work Plan—August 2017 (Work Plan) dated <br /> 29 August 2017. <br /> The Nomellini Construction Company property is located at 1045 West Charter Way in Stockton <br /> (Site). <br /> AGE installed two soil gas wells, SV-1 and SV-2, in May 2017, and collected a shallow soil <br /> sample from 5 ft bgs from each boring. AGE did not detect petroleum hydrocarbons in either <br /> soil sample. AGE performed two soil gas sampling events, one in August 2017 and one in <br /> March 2018. During the August 2017 event, AGE detected 3.4 micrograms per cubic meter <br /> (ug/m3) of toluene and 5 ug/m3 methyl tert butyl ether (MTBE) in sample SV-2. AGE did not <br /> detect petroleum hydrocarbons in either sample collected during the March 2018 sampling <br /> event. Percent oxygen was 3.6% and 7.8% during the August 2017 sampling event, and 4.7% <br /> and 10% during the March 2018 sampling event. The leak detection compound was not <br /> detected in any of the samples. <br /> In the Work Plan, AGE proposes to install two intermediate screened wells, MW-16 and MW-17, <br /> both screened from 35 to 55 feet below ground surface (ft bgs). Well MW-16 is proposed to be <br /> located approximately 5 to 10 feet from previously proposed soil boring B-23, and well MW-17 is <br /> proposed to be located approximately 5 to 10 feet from previously proposed boring B-24. AGE <br /> proposed to perform 4 quarterly monitoring events after installation. <br /> KARL E. LONGLEY SCD, P.E., CHAIR 1 PATRICK PULUPA, ESU., EXECUTIVE OFFICER <br /> 11020 Sun Center Drive#200,Rancho Cordova.CA 95670 1 www.waterboards.ca.gov/centralvalley <br /> C,o.RECYCLEU PAPER <br />
The URL can be used to link to this page
Your browser does not support the video tag.