My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
300
>
2900 - Site Mitigation Program
>
PR0544892
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2022 11:35:18 AM
Creation date
5/13/2020 3:13:24 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0544892
PE
2960
FACILITY_ID
FA0025521
FACILITY_NAME
OLIVAREZ PROPERTY
STREET_NUMBER
300
Direction
S
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
14909001
CURRENT_STATUS
01
SITE_LOCATION
300 S CALIFORNIA ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\lsauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PERMIT NO.: 1019-6SV-0674 <br /> PERMITTEE: Ground Zero Analysis,Inc. <br /> DATE: October 22,2019 <br /> Permittee shall notify the State Representative JOE VALDEZ, (209) 948-3656 or by email: <br /> Joseph.A.Valdez(a_dot.ca.gov, P. O. Box 2048 Stockton, CA 95201, SEVEN WORKING DAYS <br /> PRIOR to the start of this work if no traffic controls will be needed to accomplish the permit work. <br /> A pre-job meeting and/or conference with the Permittee/Permittee's Contractor, and State <br /> Representative is required prior to start of work unless waived by the State Representative. <br /> Permittee shall contact the State Representative and arrange for the pre-job meeting. <br /> Failure on the Permittee's part to comply with any provision will be cause for revocation of this <br /> permit. <br /> Permittee shall, .prior to commencement of any work, provide the State Representative with the <br /> name and phone number of the person in responsible charge of the work to be performed under <br /> this permit. <br /> Before commencing work, Permittee must obtain written concurrence from the State Highway <br /> Resident Engineer on the scheduling of the proposed work. This requirement is applicable when <br /> the permit work is located within or adjacent to an active Caltrans construction workzone. <br /> Permittee/Contractor shall work with the State representative to request traffic control <br /> reservations for shoulder work and/or lane closure(s) needed to accomplish the work under this <br /> permit. Request shall be on the Monday of the week prior to when the work is scheduled to occur. <br /> The State representative will submit the traffic control request to the District 10 Traffic <br /> Management Center (TMC) and when accepted will forward the traffic control ID back to the <br /> Permittee/Contractor by Friday afternoon of the week prior to when the work is scheduled to occur. <br /> All Lane closures shall be called in by either the Permittee or the Permittee's Contractor, <br /> whichever is agreed upon. This shall be accomplished when jobsite traffic control is set, and then <br /> again when removed for the day. The assigned traffic control ID provided shall be called into the <br /> District 10 Traffic Management Center (TMC). The traffic control status codes are.- <br /> * <br /> re:• 10-97 when traffic control begins <br /> • 10-98 when traffic control ends <br /> • 10-22 when traffic control is cancelled <br /> The TMC can be reached 24 hours a day -7 days a week at (209) 948-7556 or 7551. Use of <br /> proper traffic control devices throughout the duration of the work is required per Caltrans Standard <br /> Plans and Standard Specifications. <br /> All night-time work requires COZEEP. The State representative may advise the Permittee of other <br /> instances when COZEEP must be present. Night work is only allowed when required per lane <br /> closure chart(s) appended to the permit. Or when allowed, in writing, by the State Representative. <br /> Arrangements for scheduling and payment for COZEEP services are the responsibility of the <br /> Permittee. <br /> Use proper traffic control devices throughout the duration of the project as per Caltrans Standard <br /> Specifications. <br /> IMMEDIATELY FOLLOWING COMPLETION FO WORK PERMITTED HEREIN, PERMITTEE <br /> SHALL FILL OUT AND MAIL NOTICE OF COMPLETEION PROVIDED BY GRANTOR. <br /> 2of4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.