My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
300
>
2900 - Site Mitigation Program
>
PR0544892
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2022 11:35:18 AM
Creation date
5/13/2020 3:13:24 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0544892
PE
2960
FACILITY_ID
FA0025521
FACILITY_NAME
OLIVAREZ PROPERTY
STREET_NUMBER
300
Direction
S
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
14909001
CURRENT_STATUS
01
SITE_LOCATION
300 S CALIFORNIA ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\lsauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PERMIT NO.: 1019-6SV-0674 <br /> PERMITTEE: Ground Zero Analysis, Inc. <br /> DATE: October 22,2019 <br /> Permittee's attention is directed to Section 6, "CONTROL OF MATERIALS", of the State Standard <br /> Specifications Reference to Engineer in the State Standard Specifications shall include State <br /> Representative. <br /> "Your attention is directed to Standard Specification, Section 5-1.36 Property and Facility <br /> Preservation, and Business and Professions Code, Section 8771. Permittee shall physically <br /> inspect the work site and locate survey monuments before work commencement. Monuments <br /> that might be disturbed shall be referenced or reset in accordance with Business and Professions <br /> Code." <br /> "If feasible, monuments should not be set within the traveled way. All monuments that must be <br /> set or perpetuated in paved surfaces, shall be constructed in accordance with Caltrans Standard <br /> Specification Section 81 'monuments' and Standard Plan A74, Type D, or equal with prior <br /> approval of the District Surveys Engineer." <br /> "Copies of Corner Records filed or Record of Surveys recorded in compliance with the Business <br /> and Professions Code shall be forwarded to the District Surveys Engineer." <br /> Except when necessary, as determined by the State Representative, no installation, construction <br /> equipment or personal vehicles shall operate or park within the traveled way. <br /> All work shall be conducted in such a manner that the excavation, excavated earth, materials and <br /> equipment will not cause any inconvenience to the highway traffic or to traffic entering the highway <br /> from any public or private approach. <br /> No earth or construction materials are to be dragged or scraped across the highway pavement. <br /> No excavated earth shall be placed or allowed to remain at a location where it can be tracked <br /> onto the highway traveled way or any public or private approach by the Permittee's construction <br /> equipment, or by traffic entering or leaving the highway traveled way. Any excavated earth or <br /> mud so tracked onto the highway pavement or public or private approach shall be immediately <br /> removed by the Permittee. <br /> In addition to the attached General Provisions, the following special provisions are also applicable: <br /> 1. Unless specifically authorized elsewhere in this permit, survey work shall not be performed: <br /> A. On holidays of an afternoon proceeding a holiday. <br /> B. In medians. <br /> C. When work requires traffic control on traveled lanes. <br /> 2. Permittee shall furnish, place, and maintain required signs, safety equipment, traffic control, <br /> and warning devices in accordance with Caltrans Manual on Uniform Traffic Control Devices <br /> 2014. <br /> 3. All personnel shall wear hard hats and class 3 vests, shirts or jackets as appropriate. <br /> 4. Unless specifically authorized in this permit, survey markings within the right of way shall be <br /> temporary. Paint used for markings shall be water-soluble and other markers shall be <br /> removed upon completion of survey. <br /> 3of4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.