My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
26 (STATE ROUTE 26)
>
8203
>
3500 - Local Oversight Program
>
PR0545707
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 8:49:54 AM
Creation date
5/13/2020 3:21:53 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545707
PE
3528
FACILITY_ID
FA0003591
FACILITY_NAME
JOHN M RISHWAIN
STREET_NUMBER
8203
Direction
E
STREET_NAME
STATE ROUTE 26
City
STOCKTON
Zip
95215-9536
APN
10114021
CURRENT_STATUS
02
SITE_LOCATION
8203 E HWY 26
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9/9-11/03 Monitoring well MW1 R was installed east of the former and current <br /> i <br /> UST location to,replace MW1 that was previously destroyed. Soil <br /> borings B6 and:137 were completed. Vapor wells <br /> VW2 and VW3 were installed. WV1A, WV1B, <br /> 09/18/03 A vapor extraction test was conducted on <br /> to 40 feet, on this date. VW1B, screened from 15 <br /> 10/06/03 A.vapor extraction test wa <br /> to 70 feet, on this date. s conducted on VW1q, screened from 40 <br /> 03/01/04 Date of "Quarterly Report — Fourth Quarter 2003" that covers work <br /> conducted in September and October 2003. C <br /> 07/20/04 Date of"Well Survey" report. <br /> 09/01/04 Date of"Soil Remediation — System Design" that proposes vapor <br /> extraction using VW1B only because the vapor test on the other <br /> wells was not productive. <br /> I <br /> 10/05/04 The vapor extraction system was started this date. <br /> 07/05 The vapor extractions stem was shut <br /> Y down since influent soil <br /> vapor samples from June 8, 2005 aid July 18, 2005 were non <br /> detect. <br /> 12/19/05 Date of "Closure Summary Report". Soil excavation and vapor <br /> extraction have been used to remediate the soil contamination to <br /> the extent feasible. Although, detection of different chemicals in <br /> different monitoring wells hasoccurred, no chemical has ever been <br /> confirmed in any monitoring well. <br /> I, <br />
The URL can be used to link to this page
Your browser does not support the video tag.