Laserfiche WebLink
v <br /> 07 June 2002 <br /> AGE-NC Project No. 99-0645 <br /> Page 5 of 9 <br /> 3.6, PROGRESS/CONFIRMATION SAMPLING <br /> After approximately six months of operation or when the efficiency of the unit has declined, soil <br /> samples will be collected from the"core"petroleum hydrocarbon impacted area at the site. Analytical <br /> results of the soil samples will serve to approximate remaining petroleum hydrocarbon levels and <br /> determine if continued remedial operation is necessary. <br /> Soil samples will be analyzed by a DHS-certified laboratory for the following constituents: <br /> • Total petroieum hydrocarbons quantified as gasoline and diesel (TPH-g and TPH-d, <br /> respectively) in accordance with EPA Method 8015 Modified, <br /> • Volatile aromatics(benzene,toluene,ethyl benzene and xylenes: BTEX)and methyl tent-butyi <br /> ether (MTBE) in accordance with EPA Method 8020; and <br /> • Fuel oxygenates including !MTBE, tertiary--butyl alcohol (TBA), di-isopropyl ether (DIPS). <br /> ethyl tertiary-butyl ether (ETBE) and tertiary-amyl methyl ether (TAME) by EPA Method <br /> 8260. <br /> Laboratory reports for soil analysis, testing methods, laboratory duality assurance/quality control <br /> (QA/QC) reports, and sample chain of custody documentation will be presented in a report with <br /> findings and recommendations. <br /> 3.7. REPORT PREPARATION <br /> Interim soil remediation results, with conclusions and applicable recommendations, will be included <br /> in quarterly ground water monitoring reports covering the 6-month time frame proposed in this work <br /> plan. The report will be in a format acceptable to the EHD and the CVRWQCB, and will be reviewed <br /> and signed by a California Registered Geologist, <br /> 4.0. PROCEDURES <br /> All field procedures will be overseen by an AGE representative under the supervision of a California <br /> Registered Geologist. Procedures for SVE well installation, underground SVE piping system <br /> installation. SVE system start-up period, sampling, monitoring, maintenance and <br /> progress/confirmation sampling are outlined below: <br /> Advanced GeoEnvironmental,Inc. <br />