Laserfiche WebLink
30 November 2000 <br /> AGI:-NC Project No. 99-061 <br /> Paine 7 of 9 <br /> Additionally. soil samples will be Field screened for the presence of'volatile orgaulic compounds <br /> using an organic vapor natter (OVM), equipped xvith a photo ionisation detector (PID). Soil sample <br /> descriptions and OVN1 readings will be recorded on a log for each boring. <br /> Following, sample collection, each preserved sample sleeve will be labeled with the horino, location. <br /> depth. time. date and samplers initials. Appropriately sealed and labeled samples will be placed in <br /> a chilled container under ice and transported under chain-of-custody procedure to a DI IS-certified <br /> laboratory. <br /> C'Uttings generated during drillim, will be placed in DOW-approved »-Mallon drums. Rinseate will <br /> he containerized in properly labeled DOT-approved 55-gallon drums. and stored on-site in an area <br /> lacking public access. Disposal alternatives will be evaluated based oil results of soil and water <br /> analysis. <br /> 4.2. WELL COMPLETION <br /> The 8.25-inch diameter pilot borings to be single-completed as a ground water monitoring wells <br /> utilising '-inch diameter schedule 40 polyvinylchloride (PVC) 0.020-inch slotted well screen and <br /> blank well casing. .A 20400t lend-th of Nrell screen is anticipated for installation of the monitoring <br /> well. A proposed monitoring well construction diagram is depicted in Figure <br /> Atter installing the well casing in each pilot boring. a filter pack material consisting ol'pre-washed <br /> 92/12 or#3 Lonestar sand will be added through the autgcl's over the screen interval to approximately <br /> two feet above the screened interval. Following placement ofthe filter pack, the well will be surged <br /> to assist in settling the filter pack. Additional sand will be added it settling" occurs. <br /> A nominal hyo-fbot bentonite sea] (pell plug non-coded bentonite pellets) will be placed above the <br /> filter pack to minimize the potential lar grout penetration into the screened section of the well. The <br /> bentonite seal will be formed by pouring bentonite pellets into the annulus and allowing them to <br /> settle on the filter pack. The hentonite pellets will be allowed to hydrate for a minimum oFone-halt <br /> hoar prior to grouting. <br /> The remaining annular space will be filled within one foot ofthe ground surface with a celllent grout. <br /> 'file grout mixture will consist ofType IIII portland neat cement and not more than 6 gallons of nater <br /> per 94-pound sack of cement. The grout vJ11 he placed by pumping through tremmic pipe. A <br /> grouting inspection will be scheduled with PHS-EHD personnel. <br /> Following completion ofthe monitoring wells, well elevations and locations will he surve\ed b% <br /> ACiI: personnel. relative to monitoring well MW-1 or a San .loaquin County elevation benchmark. <br /> Advancedfocail:ucirroriIll enlal, lug. <br />