My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
ALPINE
>
1624
>
2900 - Site Mitigation Program
>
PR0544402
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2020 4:57:36 PM
Creation date
5/13/2020 4:00:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0544402
PE
2959
FACILITY_ID
FA0025244
FACILITY_NAME
FORMER KEARNEY - KPF FACILITY
STREET_NUMBER
1624
Direction
E
STREET_NAME
ALPINE
STREET_TYPE
AVE
City
STOCKTON
Zip
95204
APN
11708006
CURRENT_STATUS
01
SITE_LOCATION
1624 E ALPINE AVE
P_LOCATION
01
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Delineation and Destruction Work Plan for Well B-1 <br /> QC samples. In part, laboratory QC samples consist of matrix spike/matrix spike duplicate <br /> samples. Laboratory QC samples are a subset of the field-investigation-derived sample. The <br /> laboratory QC requirements are included in the laboratory QA project plans, which are included <br /> in the water quality sampling and analysis plan for the site (Dudek&Associates 2004). <br /> 8.2 Data Management <br /> Steps will be taken in the field, office, and laboratory to ensure that data are transferred accurately <br /> from collection to analysis to reporting. Sample documentation, including labeling, chain-of- <br /> custody forms, and custody seals, will be completed to ensure that data are transferred accurately <br /> to the laboratory. Notes will be taken in the field to double-check chain-of-custody forms for <br /> accuracy. Laboratory reports will be checked for completeness. Final laboratory reports will be <br /> reviewed by the laboratory QA manager or laboratory project manager for errors before release. <br /> Data will be entered into the computer by hand, and the data entry will be checked by a second <br /> person.The data listed in the text,tables,and figures will be checked against the laboratory reports. <br /> Instrument Calibration <br /> Laboratory calibration activities are described in the laboratory QA project plans. Field calibration <br /> activities and results will be recorded on forms and included with field notes. <br /> 9 REPORTING <br /> Following completion of the delineation and destruction activities, as described in Chapter 2, <br /> Delineation of Impacts from Unauthorized Release, and Chapter 3, Well Destruction Activities, <br /> Dudek will prepare a delineation and destruction completion report. The report will include an <br /> evaluation of the groundwater and soil sampling results,discussion of the extent of impacts from <br /> the unauthorized release, a summary of the destruction activities, the County EHD-approved <br /> well destruction permits, and certification of proper well destruction by a state-licensed C-57 <br /> drilling contractor. <br /> 10 ADDITIONAL REGULATORY REQUIREMENTS <br /> This delineation and destruction work plan will be submitted to DTSC for approval. The approved <br /> delineation and destruction work plan will be provided to the County EHD prior to fieldwork to <br /> obtain a monitoring well destruction permit. Per the County Well Standards(2005),a County EHD <br /> inspector may be present during the well decommissioning field activities. <br /> 10886-7 <br /> DUDEK 12 January 2019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.