My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008818
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
26 (STATE ROUTE 26)
>
8203
>
3500 - Local Oversight Program
>
PR0545707
>
ARCHIVED REPORTS_XR0008818
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 8:48:27 AM
Creation date
5/13/2020 4:01:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008818
RECORD_ID
PR0545707
PE
3528
FACILITY_ID
FA0003591
FACILITY_NAME
JOHN M RISHWAIN
STREET_NUMBER
8203
Direction
E
STREET_NAME
STATE ROUTE 26
City
STOCKTON
Zip
95215-9536
APN
10114021
CURRENT_STATUS
02
SITE_LOCATION
8203 E HWY 26
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
} <br /> 01 March 2004 <br /> AGE-NC Project No 99-0645 <br /> Page 4 of 11 <br /> 23 SVE PROCEDURES <br /> As per the AGE submitted Site Assessment and Soil Vapor Extraction Feasibility Work Plan, dated <br /> 12 August 2002 and Work Plan Addendum - Site Assessment and Feasibility Analysts, dated 08 <br /> September 2002,two soil vapor extraction pilot tests were conducted on 18 September 2003 and 06 <br /> October 2003 <br /> On 18 September 2003,the upper sand layer was tested using vapor well VW 1 B, screened from 15 <br /> feet bsg to 40 feet bsg as the extraction well On 06 October 2003, a second pilot test was conducted <br /> on the fine-grained deeper impacted areas closest to ground water at the site using vapor well <br /> VW1A, screened from 40 feet bsg to 70 feet bsg as the extraction well The pilot tests were <br /> performed to evaluate SVE as a remedial alternative The tests were conducted using a vapor <br /> extraction system(VES),VACLEEN l OOOG,manufactured by Environmental Techniques The VES <br /> unit consists of a positive displacement blower, driven by an internal combustion (IC) engine <br /> Propane was used as a supplemental fuel source to start the engine and maintain performance <br /> Hydrocarbon vapor was destroyed as part of the internal combustion process Emissions from the <br /> engine were routed through two catalytic converters to maximize the destruction rate of the extracted <br /> hydrocarbon vapors <br /> 2 3 1 SVE Pilot Test <br /> On 18 September 2003, the pilot test was initiated at 8 00 am and continued for approximately <br /> 8hours An induced vacuum potential was applied to the casing of vapor well VW1B The vacuum- <br /> induced pressure reduction was monitored at surrounding observation points(VW 1 A,V W2,V W3, <br /> MW-1 R,MW-2 and MW-3)with air tight well caps pre-connected with Magnehelic vacuum gauges <br /> fitted to each observation well A sample port was tapped into the PVC near the wellhead and a <br /> portable organic vapor meter equipped with a PID was used to measure organic vapor (OV) <br /> concentrations The extraction flow rate was measured in-line with a flow rotometer,directly before <br /> the VES The organic vapor concentrations, induced, vacuum potential at the observation points, <br /> extracted soil vapor flow rate,and revolutions per minute(RPM) of the SVE unit were measured at <br /> 0 5 hour intervals and logged on field sheets <br /> On 06 October 2003,the pilot test was initiated at 8 20am and continued for approximately 8 hours <br /> The induced vacuum potential was applied to the casing of vapor well VW 1 A and vacuum-induced <br /> pressure reduction was monitored at the surrounding observation points(VW 1 B,V W2,V W3,MW- <br /> 1 R,MW-2 and MW-3)with air tight well caps pre-connected with Magnehelic vacuum gauges fitted <br /> to each observation well The same procedure was followed as that on 18 September 2003 Result <br /> of the pilot for each date are summarized in Table 2 and a copy of the field logs are including in <br /> Appendix C <br /> Advameed GeoFnvironrnental,Inc <br />
The URL can be used to link to this page
Your browser does not support the video tag.