My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
5000
>
2900 - Site Mitigation Program
>
PR0545265
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2020 4:40:57 PM
Creation date
5/13/2020 4:01:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0545265
PE
2950
FACILITY_ID
FA0025736
FACILITY_NAME
SCK TAXIWAY D REBAB
STREET_NUMBER
5000
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
17726034
CURRENT_STATUS
01
SITE_LOCATION
5000 S AIRPORT WAY
P_LOCATION
01
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Job Steps Hazards Controls RAC <br /> Maintenance 1. Equipment 1. The drilling rig and associated equipment must be L <br /> maintained in a proper functioning condition. All motors <br /> must be shut off and electrical, mechanical and hydraulic <br /> components locked out of service when making repairs. <br /> All equipment must be inspected daily prior to use. <br /> Equipment must be operated and maintained in <br /> 2. Fire accordance with manufacturer guidelines. Safety shutoff <br /> system must be tested daily and not disabled. Bleed off <br /> pressure on hydraulic lines before undoing fittings. Do not <br /> leave tools or parts loose on the rig after maintenance has <br /> been performed. <br /> 2. All motors must be shut off during refueling. Smoking in <br /> the vicinity of the drilling rig is not permitted. An A-B-C fire <br /> extinguisher must be maintained on the drilling rig and <br /> associated motorized equipment. Fuel containers will not <br /> be stored within 10' of the drilling rig motor. Fuel will be <br /> stored in UL approved safety containers with contents <br /> clearly labeled. <br /> Hazardous Drilling Locations 1. Explosion 1. Special procedures will be implemented when drilling in M <br /> known natural gas locations, such as special mud <br /> procedures and blow out preventers. <br />
The URL can be used to link to this page
Your browser does not support the video tag.