My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0013290
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
REPORT
>
1525
>
2600 - Land Use Program
>
PA-2000070
>
SU0013290
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2021 8:44:25 AM
Creation date
5/13/2020 4:50:30 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0013290
PE
2637
FACILITY_NAME
PA-2000070
STREET_NUMBER
1525
Direction
N
STREET_NAME
REPORT
STREET_TYPE
AVE
City
STOCKTON
Zip
95205-
APN
14317021
ENTERED_DATE
5/13/2020 12:00:00 AM
SITE_LOCATION
1525 N REPORT AVE
RECEIVED_DATE
5/8/2020 12:00:00 AM
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Wastewater Collection Procedures <br /> 1.0 Purpose <br /> 1.1 The purpose of this procedure is to detail the process of MLC tenant-operator <br /> Cultivation Departments onsite wastewater collection, and disposal process. <br /> 2.0 Scope <br /> 2.1 The extent of this procedure includes, but is not limited to,the Cultivation <br /> Department at MLC tenant-operator cultivation facilities. <br /> 3.0 Wastewater Collection Process <br /> 3.1 Before watering, the lead cultivation technician must always place a wastewater <br /> receptacle underneath the drainage grate located at the end of each cultivation <br /> table <br /> 3.2 After placing the Primary Wastewater Receptacle underneath the drainage grate at <br /> the end of each cultivation table, locate, and transport the Mobile Wastewater <br /> Receptacle into the cultivation unit that you are about to water <br /> 3.3 The lead cultivation technician will begin to water one cultivation table at a time, <br /> while another cultivation technician observes the Primary Wastewater Receptacle <br /> that is located underneath the drainage grate of the cultivation tray/table that is <br /> being watered <br /> 3.4 The cultivation technician who is operating the Mobile Wastewater Receptacle, <br /> observes the Primary Wastewater Receptacle that is collecting the wastewater <br /> from the cultivation table being watered by the lead cultivation technician <br /> 3.5 As the Primary Wastewater Receptacle begins to fill,the cultivation technician <br /> who is operating the Mobile Wastewater Receptacle places the pump that is <br /> connected to the Mobile Wastewater receptacle inside of it, and begins to pump <br /> the wastewater into the Mobile Wastewater Receptacle <br /> Morada Land Company 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.