Laserfiche WebLink
u W�q 7'E <br /> �-R <br /> 3.6 Once all wastewater has been drained from the table that the lead cultivation <br /> technician has just watered,repeat steps 4.3 through 4.5, until all cultivation <br /> tables within the cultivation unit have been adequately watered <br /> 3.7 After the watering process is complete, and all wastewater has been collected into <br /> the Mobile Wastewater Receptacle,transport the Mobile Wastewater Receptacle <br /> to the onsite Stationary Wastewater Receptacle <br /> 3.8 Place the pump connected to the Mobile Wastewater Receptacle into the <br /> Stationary Wastewater Receptacle <br /> 3.9 Pump all wastewater from Mobile Wastewater Receptacle into the Stationary <br /> Wastewater Receptacle <br /> Morada Land Company IJ <br />