My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SPRECKELS
>
18800
>
2900 - Site Mitigation Program
>
PR0506460
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2020 1:22:09 PM
Creation date
5/14/2020 12:30:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0506460
PE
2950
FACILITY_ID
FA0007440
FACILITY_NAME
ATHERTON KIRK/SPRECKELS
STREET_NUMBER
18800
STREET_NAME
SPRECKELS
STREET_TYPE
RD
City
MANTECA
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
18800 SPRECKELS RD
P_LOCATION
04
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
283
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S■ KLEINFELDER <br /> File No. 20-3978-01.Wr6 <br /> February 24, 1997 <br /> 4 ACTIVITIES CONDUCTED <br /> As a part of the field assessment, a total of twenty-seven (27) locations were sampled. <br /> Kleinfelder obtained a total of 32 soil samples from the 27 locations. Chemical analysis was <br /> subsequently conducted on 28 of the 32 soil samples obtained. <br /> 4.1 PRE-FIELD ACTIVITIES <br /> As required by San Joaquin County Public Health Services Department Environmental Health <br /> Division (PHS/EHD), Kleinfelder submitted a boring/well permit and a workplan to San <br /> Joaquin County PHS/EHD because closure will be requested for the railroad spurs. <br /> Kleinfelder prepared a health and safety plan for use in the field. For a copy of the workplan <br /> approval (approved December 9, 1996) and the boring permit (approved November 29, 1996), <br /> please refer to Appendix B. <br /> The plans for the local areas were inspected to establish the presence/absence of underground <br /> utility or process piping. <br /> 4.2 FIELD ACTIVITIES <br /> Over the course of three days (December 26-27, 1997, January 13, 1997), a total of twenty- <br /> seven (27) locations were sampled in the vicinity of the railroad spurs (refer to Plate 3). All <br /> samples were collected using a slide-hammer sampler, including eight (8) samples collected at <br /> a depth of five (5) feet. The 5 foot samples were collected via hand auger soil borings. From <br /> the 27 locations, twenty-four (24) surface soil samples were collected at approximate 300 foot <br /> intervals on alternating sides of the railbed. The deeper five foot samples were collected at <br /> eight randomly selected locations, as soil staining was not evident at any of the surface sample <br /> locations. <br /> The hand auger borings were logged and sampled according to the protocol described in <br /> Attachment A. The hand auger borings were backfilled with the cuttings generated during <br /> sampling. <br /> 20-3978-0/.WR61207RE074 Page 9 of 17 01997, Kleinfelder,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.