Laserfiche WebLink
1 (6) Time Schedule for Remedial Investigation (RI) <br /> 2 Workplan Implementation from Date of Department <br /> 3 Approval, to include: <br /> 4 (a) Field Investigation; <br /> 5 (b) Laboratory Analysis; <br /> 6 (c) Interim Reports Submittal ; <br /> 7 (d) Engineering Analysis of Data Collected; <br /> 8 (e) Submittal of Final Remedial Investigation <br /> 9 Report. <br /> 10 b. The Remedial Investigation Report portion of the <br /> 11 Workplan shall describe the steps necessary to submit <br /> 12 this report in compliance with paragraph 5. 1. 4 . <br /> 13 C. The Feasibility Study portion of the Workplan shall <br /> 14 include a plan for providing at least the following <br /> 15 elements in the Feasibility Study: <br /> 16 (1) A summary of the existing and potential hazards <br /> 17 for which corrective action is required; <br /> 18 (2) A description of the alternative remedial <br /> 19 actions which will be evaluated; <br /> 20 (3) A list of the technologies which will be <br /> 21 screened for each alternative remedial action <br /> 22 described in (2) above; <br /> 23 (4) A description of the factors which will be <br /> 24 considered in screening and analyzing each <br /> 25 alternative remedial action technology, <br /> 26 including, but not limited to, effectiveness, <br /> 27 reliability, timeliness of implementation, unit <br /> GOURTPAPER <br /> YTATI OF CALIFORNIA <br /> $TD. 113 IREV. 6-731 -17_ <br /> E5 31JB9 <br />