My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SCOTTS
>
540
>
2900 - Site Mitigation Program
>
PR0507144
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2020 2:02:41 PM
Creation date
5/14/2020 1:32:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0507144
PE
2950
FACILITY_ID
FA0007712
FACILITY_NAME
ACME STOCKTON GALVANIZING
STREET_NUMBER
540
Direction
W
STREET_NAME
SCOTTS
STREET_TYPE
AVE
City
STOCKTON
Zip
95206
APN
14704048
CURRENT_STATUS
01
SITE_LOCATION
540 W SCOTTS AVE
P_LOCATION
01
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
00 • 9 <br /> 1 cost, availability, operation and maintenance <br /> 2 costs and conformity with applicable laws and <br /> 3 regulations; <br /> 4 (5) A list of the criteria for screening and <br /> 5 analyzing the alternative remedial action <br /> 6 technologies; <br /> 7 (6) A description of all pilot studies, bench tests <br /> 8 or other activities which will be performed to <br /> 9 evaluate each alternative remedial action <br /> 10 technology. <br /> 11 d. The Feasibility Study Report portion of the Workplan <br /> 12 shall describe the steps necessary to submit this <br /> 13 report in compliance with paragraph 5. 1.5. <br /> 14 e. The Community Relations Plan portion of the Workplan <br /> 15 shall describe the steps necessary to submit this <br /> 16 plan in compliance with paragraph 5 . 1. 6. <br /> 17 5. 1 . 4 Remedial Investigation Report <br /> 18 The Remedial Investigation Report shall be submitted by <br /> 19 Respondents to the Department for review and approval in <br /> 20 accordance with the approved Workplan implementation schedule. <br /> 21 The Remedial Investigation Report shall summarize the <br /> 22 methodology and results of the Remedial Investigation including <br /> 23 reduction and interpretation of all data and information <br /> 24 generated and/or compiled during the Remedial Investigation. <br /> 25 The Remedial Investigation Report shall cover the following <br /> 26 subjects relating to the Site: <br /> 27 <br /> COURT PAPER <br /> STATE OI CALIFORNIA <br /> STD. 113 (REV. 8.721 X18 <br /> 85 31]89 <br />
The URL can be used to link to this page
Your browser does not support the video tag.