Laserfiche WebLink
00 • 0 <br /> 1 i. Public Health and Environmental Concerns <br /> 2 (1) Potential Receptors <br /> 3 (2) Public Health Impacts <br /> 4 (3) Environmental Impacts <br /> 5 5. 1. 5 Feasibility Study Report <br /> 6 The Feasibility Study Report shall be submitted to the <br /> 7 Department for review and approval in accordance with the <br /> 8 approved Workplan implementation schedule. The Feasibility <br /> 9 Study Report shall summarize the results of the Feasibility <br /> 10 Study including reduction and interpretation of all data and <br /> 11 information generated and/or compiled during the Feasibility <br /> 12 Study. The Feasibility Study Report shall cover the following <br /> 13 subjects relating to the Site: <br /> 14 a. Description of Current Situation <br /> 15 (1) Site Background Information <br /> 16 (2) Nature and Extent of Release <br /> 17 (3) Objective of Remedial Action(s) <br /> 18 b. Screening of Remedial Action Technologies <br /> 19 (1) Technical Criteria <br /> 20 (2) Remedial Action Alternatives Developed <br /> 21 (3) Environmental and Public Health Criteria <br /> 22 (4) Other Screening Criteria <br /> 23 (5) Cost Criteria <br /> 24 (6) Institutional Criteria <br /> 25 C. Analysis of Remedial Action Alternatives <br /> 26 (1) Technical Feasibility <br /> 27 (2) Environmental Evaluation <br /> COURT PAPER <br /> STATE OF GLJTCRMIA <br /> STD. II3 (REV. 8-73) -20- <br /> M 30]69 <br />