My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SCOTTS
>
540
>
2900 - Site Mitigation Program
>
PR0507144
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2020 1:37:50 PM
Creation date
5/14/2020 1:33:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0507144
PE
2950
FACILITY_ID
FA0007712
FACILITY_NAME
ACME STOCKTON GALVANIZING
STREET_NUMBER
540
Direction
W
STREET_NAME
SCOTTS
STREET_TYPE
AVE
City
STOCKTON
Zip
95206
APN
14704048
CURRENT_STATUS
01
SITE_LOCATION
540 W SCOTTS AVE
P_LOCATION
01
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 0 <br /> D) Physical and Non-Chemical Hazards <br /> See Table III (to be filled out by CHSO/HSO) <br /> E) Overall Rating of Risk due to Project Hazards (to be filled out by <br /> CHSO/HSO) <br /> Serious Moderate Low <br /> ' F) Utility Clearance <br /> 1) Field clearance done by: U.S.A. Underground Utility Location and WILLIAM <br /> DUBOVSKY ENVIRONMENTAL <br /> ' 2)List Instruments used: Field observation and steel probe used to locate <br /> subsurface electrical conduits. <br /> III. Air Monitoring Equipment/Personal Protective Equipment and Action Levels <br /> The results shall be interpreted by the Site Safety Officer. Monitoring results and <br /> calibration logs are to be completed, sent to the Corporate Health and Safety <br /> ' Officer, and to be filed with the Site Safety and Health Plan - see Attachments 1 and <br /> 2. <br /> All monitoring shall be performed on a periodic basis. Periodic is defined as <br /> adequate characterization before, during and after each task/activity. Monitoring <br /> should continue on a continuous basis until the operation is stable and the SSO or <br /> CHSO feel that the monitoring is sufficient to adequately assess and characterize <br /> exposure during that operation. <br /> ' A minimum of three independent data points taken one minute is suggested. <br /> Upon task/environmental/activity stabilization periodic monitoring, continuously for <br /> ' 4 hours per shift. All exposure assessment to all chemicals identified as necessary <br /> below. Additional characterization monitoring shall begin immediately if the <br /> operation destabilizes the environment changes, or the potential for exposure is <br /> otherwise affected. Monitoring Instruments/Direct Reading Instruments (to be filled <br /> out by CHSO/HSO) <br /> r <br />
The URL can be used to link to this page
Your browser does not support the video tag.