My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SCOTTS
>
540
>
2900 - Site Mitigation Program
>
PR0507144
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2020 1:37:50 PM
Creation date
5/14/2020 1:33:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0507144
PE
2950
FACILITY_ID
FA0007712
FACILITY_NAME
ACME STOCKTON GALVANIZING
STREET_NUMBER
540
Direction
W
STREET_NAME
SCOTTS
STREET_TYPE
AVE
City
STOCKTON
Zip
95206
APN
14704048
CURRENT_STATUS
01
SITE_LOCATION
540 W SCOTTS AVE
P_LOCATION
01
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E) Written Work Plan: YesX <br /> Approval from: DTSC Hazardous Substance Engineer, Fernando Amador and <br /> the Law offices of Tobin and Tobin. John Hall Environmental Counsel <br /> H) Project Crew: Bayland Drilling/WILLIAM DUBOVSKY ENVIRONMENTAL <br /> Project Manager: William Dubovsky <br /> ' Field Supervisor: John Carver <br /> Site Safety Officer: William Dubovsky <br /> Team Members: 4 <br /> II. Health Risk Analysis <br /> ' A) Job Tasks to be performed: <br /> 1) Inspection of the integrity of the asphalt cap covering the treated and <br /> ' stabilized soil at the site. Photographic documentation of the asphalt cap will <br /> be included in the report. <br /> ' 2) Drill one soil boring in the approximate center of the stabilized soil to 5 feet <br /> below the asphalt cap. Collect samples of the stabilized material and <br /> underlying soil for laboratory testing. <br /> 3) Monitor and sample the three groundwater monitoring wells on the site and <br /> analyze the groundwater samples. <br /> 4) Prepare working drawings which will show the location of the asphalt cap, <br /> ' boring location and the positions of the three existing groundwater monitoring <br /> wells. <br /> ' 5) Publish a summary report documenting the work carried out along with <br /> conclusions and recommendations. <br /> ' B) Summary of Potential Exposure Conditions, Pathways, Chemical Hazards <br /> and Physical Hazards:. <br /> See Table I (to be filled out by CHSO/HSO) <br /> C) Chemical Hazard Data: <br /> See Table II (to be filled out by CHSO/HSO <br /> All excavation personal will be required to wear hard hats, safety glasses and <br /> safety boots. Also required will be for the excavation personal to have C Class <br /> Chemical protection equipment. Levels of contamination will be monitored by the <br /> site safety officer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.