Laserfiche WebLink
COMMENTS ON DEVELOPMENTS <br /> SA-92-46 <br /> 4 . The Water Supply Facilities Impact Mitigation Fee will be <br /> required for this development. The fee is due and payable at <br /> the time of building permit application. (The fee currently <br /> is $88 . 89 per 1, 000 gross square foot of building as <br /> "Manufacturing" . If there is no building permit required, the <br /> fee will be exempt. The fee shall be automatically increased <br /> on January 1 of each year at the rate of 6. 9 percent. An <br /> additional 3 . 5 percent shall be added to the fee upon payment <br /> for processing and administering the program. <br /> (Resolution R-91-327) <br /> 5. A traf f is study shall be conducted to determine traff is impacts <br /> and mitigation measures. The developer shall deposit with the <br /> County funds for all costs, as estimated by the Public Works <br /> Department Public Facility Division, prior to Public Works <br /> Department preparing or contracting for the required study. <br /> c: Manuel Lopez <br /> Deputy Director/Development <br />