My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PALM
>
11651
>
2900 - Site Mitigation Program
>
PR0503361
>
COMPLIANCE INFO_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2020 2:18:48 PM
Creation date
5/15/2020 4:45:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
FileName_PostFix
FILE 1
RECORD_ID
PR0503361
PE
2960
FACILITY_ID
FA0005798
FACILITY_NAME
SOUTHWEST HIDE COMPANY
STREET_NUMBER
11651
STREET_NAME
PALM
STREET_TYPE
LN
City
RIPON
Zip
95366
APN
22809005
CURRENT_STATUS
01
SITE_LOCATION
11651 PALM LN
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item No. 3 <br /> PC: 2-18-88 <br /> UP-88-20 <br /> Page 4 <br /> The following steps describe the treatment process: <br /> 1 . The concrete slab's curbing will be sealed to prevent <br /> spillage of soil and water. <br /> 2 . Soil samples will be taken for laboratory analysis <br /> (petroleum hydrocarbon content) . <br /> 3 . Soil will be fertilized to bring nitrate and phosphorus <br /> level to at least 20 parts per million (ppm) and 5 ppm. <br /> Soil will be thoroughly mixed. <br /> 4 . Soil will be thoroughly wetted to bring the field moisture <br /> level in the soil to 30 - 70 percent . <br /> 5 . Prepare bacterial additive ; after incubq.tion period, dilute <br /> and spray over the entire surface of the contaminated soil . <br /> 6 . Thoroughly mix the entire contaminated soil mass. <br /> 7 . Sprinkle the soil surface with water to maintain 30 - 70 <br /> percent moisture condition at all times. <br /> r <br /> B . Repeat Items 6 and 7 above on a daily basis to ensure that <br /> adequate oxygen and moisture reach the entire mass. <br /> 9 . Take samples of soil every two weeks for laboratory analy- <br /> sis to determine treatment progress. <br /> 10 . When laboratory analysis indicates that the soil 's petro- <br /> leum hydrocarbon level has been reduced to meet the regula- <br /> tory agency ' s acceptable standards , the cleansed soil is <br /> hauled away to its permanent resting place . <br /> 11 . The concrete slab will be "reloaded" as described above and <br /> treated as stated in Items 1 - 10 . <br /> Contaminated soil will be transported to the project site by <br /> dump truck for processing. The applicant indicates that a <br /> small tractor will be used on the concrete treatment slab to <br /> mix and aeriate the soil . Once the soil is "clean, " it will be <br /> loaded on haul trucks by the tractor for delivery to fill sites <br /> or cropland. All operations will be restricted to daylight <br /> hours . <br /> The potential exists for spillage of the contaminated soil <br /> material during the unloading process . In addition, mixing of <br /> the material during the treatment process may also result in <br />
The URL can be used to link to this page
Your browser does not support the video tag.