My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PALM
>
11651
>
2900 - Site Mitigation Program
>
PR0503361
>
COMPLIANCE INFO_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2020 2:18:48 PM
Creation date
5/15/2020 4:45:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
FileName_PostFix
FILE 1
RECORD_ID
PR0503361
PE
2960
FACILITY_ID
FA0005798
FACILITY_NAME
SOUTHWEST HIDE COMPANY
STREET_NUMBER
11651
STREET_NAME
PALM
STREET_TYPE
LN
City
RIPON
Zip
95366
APN
22809005
CURRENT_STATUS
01
SITE_LOCATION
11651 PALM LN
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item No . 3 <br /> PC: 2-18-88 <br /> UP-88-20 <br /> Page 5 <br /> spill-over . In order to ensure containment of the material , a <br /> condition of approval is proposed which would add a perimeter <br /> concrete driveway and containment curb to the treatment slab . <br /> Process water will be pumped from an existing on-site irriga- <br /> tion well . No runoff from the decontamination operation is <br /> expected due to the controlled water spraying and mixing pro- <br /> cess. Storm runoff will be collected on-site and retained in a <br /> separate storm retention pond. <br /> In order to control the type and level of toxicity of each <br /> batch, samples will be tested regularly by a certified labora- <br /> tory and the results transmitted to the Local Health District <br /> and the State Department of Health Services . Treated soil will <br /> not be removed from the facility unless both agencies issue <br /> their clearance permits. <br /> ENVIRONMENTAL CONSIDERATIONS : <br /> An Initial Study was prepared on January 8 , 1988 , and no signifi- <br /> cant environmental effects were identified. On that basis , a <br /> proposed Negative Declaration has been prepared for the <br /> Commission ' s consideration. Major issues evaluated in the <br /> Initial Study were : ( 1 ) potential for spillage , ( 2 ) depth to <br /> groundwater , ( 3 ) haul routes , ( 4 ) air quality degradation, ( 5 ) <br /> noise generation, and ( 6) area resident safety. Proposed con- <br /> ditions of approval have reduced or eliminated these issues to <br /> insignificant levels. <br />
The URL can be used to link to this page
Your browser does not support the video tag.