Laserfiche WebLink
SJCAPCD <br /> Suggested Mitigation Measures <br /> Page 2 <br /> 3) Use of petroleum-based dust palliative shall meet the <br /> road oil requirements of the District 's Rules 409 .5 <br /> Cutback Asphalt Paving Materials. <br /> 4) Streets adjacent to the project site should be swept as <br /> needed to remove silt which may have accumulated from <br /> construction activities. <br /> D. At all times, ozone precursor emissions should be controlled <br /> by the following methods: <br /> 1) All internal combustion engine driven equipment should <br /> be properly maintained and well tuned according to <br /> manufacturer' s specifications. <br /> 2) During the smog season (May through October) , the <br /> construction period should be lengthened so as to <br /> minimize the number of vehicles and equipment operating <br /> at the same time. <br />