My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0013271
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOWER SACRAMENTO
>
18826
>
2600 - Land Use Program
>
DP-91-42
>
SU0013271
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2020 3:01:46 PM
Creation date
5/18/2020 9:47:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0013271
PE
2600
FACILITY_NAME
DP-91-42
STREET_NUMBER
18826
Direction
N
STREET_NAME
LOWER SACRAMENTO
STREET_TYPE
RD
City
WOODBRIDGE
Zip
95258-
APN
01514034
ENTERED_DATE
5/12/2020 12:00:00 AM
SITE_LOCATION
18826 N LOWER SACRAMENTO RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOAQUIN COUNTY <br /> AIR POLLUTION CONTROL DISTRICT <br /> Suggested Mitigation Measures <br /> A. Emissions generated during the construction process are of <br /> concern to the District. The following dust control <br /> practices should be implemented: <br /> 1) All material excavated or graded should be sufficiently <br /> watered to prevent excessive amount of dust. Watering <br /> should occur at least twice a day with complete <br /> coverage, preferably in the late morning and after work <br /> is done for the day. <br /> 2) All clearing, grading earth moving or excavation <br /> activities shall cease during periods of high winds <br /> greater than 20 mph average over one hour. <br /> 3 ) All material transported off-site shall be either <br /> sufficiently watered or securely covered to prevent <br /> excessive amount of dust. <br /> 4) The area disturbed by clearing, earth moving or <br /> excavation activities should be minimized at all times. <br /> 5) The developer should mow instead of disking for weed <br /> control, thereby leaving the ground undisturbed and with <br /> a mulch covering. <br /> B. After clearing, grading, earth moving, or excavation <br /> operation, fugitive dust emissions during construction phase <br /> should be controlled by the following methods: <br /> 1) All inactive portions of the construction site should be <br /> seeded and watered until grass growth is evident. <br /> 2) All active portions of the site shall be sufficiently <br /> watered to prevent excessive amount of dust. <br /> C. At all times, fugitive dust emissions should be controlled <br /> using the following procedures: <br /> 1) On-site vehicle speed shall be limited to 15 mph. <br /> 2) All area with vehicle traffic should be watered <br /> periodically for stabilization of dust emissions . <br />
The URL can be used to link to this page
Your browser does not support the video tag.