Laserfiche WebLink
16 May 2012 <br /> AGE-NC Project No. 12-2113 <br /> Page 3 of 5 <br /> BORING ADVANCEMENT <br /> Borings proposed inside the buildings will be advanced utilizing a Bosch 11223 EVS <br /> Hammer Drill equipped with 5/a-inch AMS Gas Vapor Probe rods. Borings proposed outside <br /> the buildings will be advanced using a truck-mounted PowerProbe 9600 direct-push <br /> probing unit equipped with 1.25-inch probing rods. The probe advances borings using a <br /> hydraulic hammer to drive soil and ground water sampling tools to specified depths. <br /> SOIL-VAPOR SAMPLE COLLECTION AND ANALYSIS <br /> Soil vapor samples will be obtained at depths of approximately five feet bsg in borings <br /> inside the buildings, and at 5 feet and 15 feet bsg in borings outside the buildings at 1350 <br /> Scotts Avenue and 1400 Scotts Avenue. <br /> Soil vapor samples inside the buildings will be collected using an AMS Gas Vapor Retract- <br /> a-Tip sampling assembly. A retractable vapor point will be placed into a point holder at the <br /> bottom of an assembly of%-inch diameter hollow rods. The vapor sampling assembly will <br /> then be advanced to the specified depth and retracted approximately 1/2-inch in order to <br /> disengage the point and expose a column of strata from which soil-vapor will be extracted. <br /> Soil vapor samples outside the buildings will be collected using a Geoprobe soil-vapor <br /> assembly. An expendable vapor point will be placed into a point holder at the bottom of an <br /> assembly of 1.25-inch diameter hollow drive rods. The assembly will then be advanced to <br /> the specified depth and retracted approximately six to twelve inches in order to disengage <br /> the expendable point and expose a column of strata from which soil vapor can be <br /> extracted. <br /> For all soil-vapor sampling, a single use, '/4-inch diameter disposable polyethylene tubing <br /> is then attached to a tubing adapter equipped with an O-ring to ensure a vacuum-tight seal. <br /> The adapter assembly is then lowered through the center of the rods to the specified depth <br /> and secured by threading into the expendable vapor point holder. A stabilization time of <br /> 20 minutes will follow boring placement. <br /> Above ground, the surface around the soil vapor sampler will be sealed with a bentonite <br /> sealant to prevent ambient air intrusion. The end of the polyethylene tubing is attached by <br /> a two-way inlet port to a Tedlar bag placed inside an SKC Vac-U-Chamber (lung box) <br /> vacuum chamber.A vacuum pump attached to a purge port of the vacuum chamber is then <br /> used to purge the exposed soil column, through the sampling tubing and inlet port, until <br /> approximately three volumes of soil vapor or ambient air is evacuated through the sampling <br /> system. The vacuum chamber is then sealed and the vacuum pump is attached to a <br /> vacuum outlet port of the chamber. When vacuum is applied to the chamber, a negative <br /> Advanced GeoEnvironmental,Inc. <br />