My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SPARTAN
>
701
>
2900 - Site Mitigation Program
>
PR0538885
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2020 9:54:23 AM
Creation date
5/18/2020 9:52:37 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0538885
PE
2965
FACILITY_ID
FA0022341
FACILITY_NAME
STORMWATER BASIN
STREET_NUMBER
701
STREET_NAME
SPARTAN
STREET_TYPE
WAY
City
LATHROP
Zip
95330
APN
19121029
CURRENT_STATUS
01
SITE_LOCATION
701 SPARTAN WAY
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 • <br /> San Joaquin County Environmental Health Department 5747.003.002 <br /> Monitor Well Destruction(MW-5 and MW-6) May 9,2014 <br /> WORK PLAN FOR WELL ABANDONMENT Page 2 <br /> San Joaquin County records indicate that groundwater in the immediate vicinity of the site has <br /> no known contamination. <br /> SCOPE OF SERVICES <br /> Our proposed scope includes drilling out the existing wells and grouting the subsequent <br /> boreholes. <br /> We will coordinate with a licensed drilling contractor to over-drill the wells to a depth of <br /> approximately 17 feet bgs, or the bottom of the previous borings, whichever is deeper. Drilling <br /> will be accomplished using a truck-mounted hollow stem auger drill rig equipped with <br /> 8-inch-diameter augers in order to remove the annular seal around each well. Given that the <br /> subsurface material is not suspected to be contaminated, drilling cuttings will be discharged on <br /> the ground surface near each of the wells. <br /> Once the wells have been adequately removed, the boreholes will be grouted with neat cement <br /> by tremie method to approximately 5 feet bgs. Bentonite pellets, which will be adequately <br /> hydrated,will be placed in the remaining five feet to the ground surface. <br /> SCHEDULE <br /> We plan to complete the well destruction by May 31, 2014 pending approval of this work plan <br /> and favorable weather. It is our understanding that because the parcels for MW-5 and MW-6 are <br /> owned by the same entity they may be covered under the same permit. <br /> If you have any questions on any portion of this work plan, please call and we will be glad to <br /> discuss them with you. <br /> oQROFESS/o <br /> Sincerely, �Q`� oS�F T00� Fti <br /> 61 <br /> ENGE Incorporated <br /> W No. 2677 rn <br /> * Exp.6/30/2014 <br /> c�0TECVA <br /> N��'Pv�'� <br /> Richard G ndol o, C SC oe Too e, GE qTF OF CP.��F�� <br /> Attachment: Site Ian <br />
The URL can be used to link to this page
Your browser does not support the video tag.