My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
STEWART
>
73
>
2900 - Site Mitigation Program
>
PR0539607
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2020 9:58:41 AM
Creation date
5/18/2020 9:57:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0539607
PE
2965
FACILITY_ID
FA0022659
FACILITY_NAME
MONITOR WELL #1 AND #2 (MWSR-1 & MWR-2)
STREET_NUMBER
73
STREET_NAME
STEWART
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
21330011
CURRENT_STATUS
01
SITE_LOCATION
73 STEWART RD
P_LOCATION
07
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
该页面上没有批注。
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
San Joaquin County Environmental Health Department 5044.411.102 <br /> Monitor Well Destruction(MWR-1 and MWR-2) November 5,2014 <br /> WORK PLAN FOR WELL ABANDONMENT Page 2 <br /> San Joaquin County records indicate that groundwater in the immediate vicinity of the site has <br /> no known contamination. <br /> SCOPE OF SERVICES <br /> The well destruction will include completely redrilling the wells to remove existing well materials <br /> and tremie backfilling the hole with neat cement under the observation of a San Joaquin County <br /> Environmental Health representative. <br /> We will coordinate with a licensed drilling contractor to over-drill the wells to a depth of <br /> approximately 20 feet bgs, or the bottom of the previous borings, whichever is deeper. Drilling <br /> will be accomplished using a truck-mounted hollow stem auger drill rig equipped with <br /> 8-inch-diameter augers in order to remove the annular seal around each well. Given that the <br /> subsurface material is not suspected to be contaminated, drilling cuttings will be discharged on <br /> the ground surface near each of the wells. <br /> Once the wells have been adequately removed, the boreholes will be grouted with neat cement <br /> by the tremie method to approximately 5 feet bgs. Hydrated bentonite pellets will be placed in <br /> the remaining five feet to the ground surface. <br /> SCHEDULE <br /> We plan to complete the well destruction by November 18, 2014 pending approval of this work <br /> plan and favorable weather. It is our understanding that because the parcels for MWR-1 and <br /> MWR-2 are owned by the same entity they may be covered under the same permit. <br /> If you have any questions on any portion of this work plan, please call and we will be glad to <br /> discuss them with you. <br /> Sincerely, <br /> DRO�F� <br /> �vF��� FLgHF��o�J� <br /> ENGEO Incorporated No. HG 460 <br /> CERTIFIED <br /> * HYDROGEOLOGIST <br /> S Exp.7/31/2015 �Q <br /> Matthew E. Miller Brian Flaherty, CH G �gTFOF CA��F��� <br /> mem/bf/zc/ag/ <br /> Attachment: Site Plan <br /> Cc: Ms. Susan Dell'Osso,River Islands Development LLC <br /> Mr. Scott Armstrong, CVRWQCB <br /> Mr. Glenn Gebhardt, City of Lathrop <br />
The URL can be used to link to this page
Your browser does not support the video tag.