Laserfiche WebLink
Page 2, 15634 Steinegul Ro <br /> The Report makes several recommendations for continued and additional work. Routine <br /> quarterly groundwater monitoring and sampling must continue until directed otherwise by <br /> this agency. Routine operation, maintenance and quarterly reporting of the SVE system <br /> must also continue. SJC/EHD agrees with the recommendation to conduct a sensitive <br /> receptor survey and to continue the investigation of the vertical and lateral extent of the <br /> contamination. <br /> Please proceed with preparation of a work plan to define the vertical and lateral extent of <br /> the contamination, in both soil and groundwater. The work plan must include deeper <br /> groundwater monitoring wells than currently exist onsite. The work plan is due for <br /> submittal to SJC/EHD no later than June 30, 2007. Please provide the sensitive <br /> receptor survey at the same time. <br /> If you have any questions please call Lori Duncan at (209)468-0337. <br /> Donna Heran, REHS, Director <br /> Environmental Health Department <br /> Lori Duncan, Senior REHS Nuel C. Henderson, Jr., PG <br /> LOP/Site Mitigation Unit IV LOP/Site Mitigation, Unit IV <br /> cc: James Barton, PG, CVRWQCB <br /> Lorraine Sawyer, PG, ATC <br />