My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
STEINEGUL
>
15634
>
3500 - Local Oversight Program
>
PR0540821
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2020 10:25:25 AM
Creation date
5/18/2020 10:08:22 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0540821
PE
2960
FACILITY_ID
FA0023401
FACILITY_NAME
FORMER GREER CONSTRUCTION
STREET_NUMBER
15634
STREET_NAME
STEINEGUL
STREET_TYPE
RD
City
ESCALON
Zip
95320
CURRENT_STATUS
01
SITE_LOCATION
15634 STEINEGUL RD
P_LOCATION
06
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
161
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A2 1/2005 18:02 209-57225 MODESTO ATC PAGE 02 <br /> ti w` <br /> s <br /> ATC Associates Inc. <br /> 1117 Lone Palm Avenue, Suite 1 <br /> Modesto,California 95351 <br /> 209-579-2221 <br /> ASSOCIATES(VIATC <br /> i w c. Fax: 209-579-2225 <br /> February 11, 2005 <br /> 54.25291.0001 <br /> Mr. Jeff Wong <br /> San Joaquin County <br /> Environmental Health Division <br /> 304 E. Weber Street, Third Floor <br /> Stockton, California 95202 <br /> Subject: VET Installation Schedule, Former Greer Property, 15634 Steinegul Road, <br /> Escalon, California, Site Code: 2021 <br /> Dear Mr. Wong: <br /> Per our recent telephone conversations, ATC Associates Inc. (ATC) has prepared a schedule of <br /> activities for the installation and startup of a vapor extraction system (VES) at the site located at <br /> 15634 Steinegul Road, Escalon, California. The VES will be installed in accordance with ATC's <br /> Interim Remediation Plan (IRP) dated March 25, 2004 and approved in a letter from SJCEHD <br /> dated April 23, 2004. '�: J 2 CJ q 1 <br /> ActivityCompletion Date 1 Comment <br /> Order Catalytic Oxidizer 02/22/05 ATC has received vendor <br /> quotes and will review and <br /> execute contract for equipment <br /> procurement. <br /> Catalytic Oxidizer Installation 04/15/05 It takes eight weeks to receive <br /> VES equipment from supplier. <br /> APCD Permit (submittal) 02/16/05 ATC contacted the APCD and <br /> 9 ` °1 ° ° e they have no application on file <br /> at this time. It will be <br /> completed/submitted ASAP. <br /> APCD Permit (issue 05/11/05 The APCD takes 30 days to <br /> review the application and <br /> another 30-60 days to process. <br /> PG&E Hookup 04/15/05 An application for PG&E <br /> service was submitted in Dec <br /> 2004. <br /> Trenching, Piping and 04/15/05 ATC will schedule and <br /> Compound complete construction <br /> activities. <br /> VES Startup 05/11/05 This date may be moved up if <br /> the ATC/PTO is issued <br /> sooner. <br /> s:knwommtan5291XrcporU\4QR-2004.doc I <br />
The URL can be used to link to this page
Your browser does not support the video tag.