Laserfiche WebLink
� U <br /> State Water Resources Controsoard <br /> Division of Clean Water Programs <br /> Winston H. Hickox 2014 T Street•Sacramento,California 95814•(916)227-4518 <br /> Mailing Address: P.O.Box 944212•Sacramento,Cali tomia•94244-2 20, Grav Davis <br /> Secretnryfor FAX(916)227-4530•Internet Address: http://www.swrcb.ca.gov/-awphb e/ustcf Governor <br /> Environmental <br /> Protection <br /> January 18, 2000 <br /> Raymond Greer <br /> 1111 1st St <br /> Escalon, CA 95320 <br /> PRE-APPROVAL OF CORRECTIVE ACTION COSTS,CLAIM NO. 008525, <br /> SITE ADDRESS: 15634 STEINEGUL RD S,ESCALON, CA 95320 <br /> I have reviewed your request,received on December 23, 1999, for pre-approval of corrective action costs; <br /> I will place these documents in-your file for future reference. I have included a copy of the"Cost Pre- <br /> Approval Request' form; please use this form in the future for requesting pre-approval of corrective <br /> actions costs. <br /> With the following provisions, the total cost pre-approved as eligible for reimbursement for completing <br /> the August 28, 1999& September 30, 1999 BSK workplan addenda approved by the San Joaquin County <br /> EHD(County) in their October 11, 1999 letter is$56,115; see the table below for a breakdown of costs. <br /> Be aware that this pre-approval does not constitute a decision on reimbursement: all reasonable and <br /> necessary corrective action costs for work directed and approved by the County will be eligible for <br /> reimbursement per the terms ofyour Letter of Commitment at costs consistent with those pre-approved in <br /> this letter. <br /> All future costs for corrective action must be approved in writing by Fund staff. <br /> Future costs for corrective action must meet the requirements of <br /> Article 11, Chapter 16, Underground Storage Tank Regulations. <br /> COST PRE-APPROVAL BREAKDOWN <br /> Task Amount Pre-Approved Comments <br /> 1. Subsurface site clearance, permit acquisition $509.35 , <br /> 2. Soil borings $16,258 Includes lab analyses. <br /> 3.Monitoring well installation $12,172 Same as above. <br /> 4. Monitoring well development&surveying $1,816 <br /> 5. Soil vapor extraction well installation $5,154 Includes lab analyses. <br /> 6. Soil vapor extraction pilot study $5,394 Includes pilot test&feasibility <br /> analysis. <br /> 7. Report preparation $1,716 <br /> 8. 4 quarters of monitoring well sampling& $13,096 $3274/quarter including lab analyses. <br /> reporting <br /> TOTAL PRE-APPROVED $56,115 <br /> California Environmental Protection Agency <br /> �a Rrrr'r/ed Paper <br />