Laserfiche WebLink
San Joaquin County DIRECTOR <br /> Donna Heran,REHS <br /> P.U,IN Environmental Health Department ASSISTANT DIRECTOR <br /> �o._- f <br /> co Laurie Cotulla,REHS <br /> 600 East Main Street <br /> uai < Stockton, California 95202-3029 PROGRAM COORDINATORS <br /> Carl Borgman,REHS <br /> -- Mike Huggins,REHS,RDI <br /> c ,-� P • Website: www.sjgov.org/ehd Margaret Lagorio,REHS <br /> 4�/FpR� Phone: (209) 468-3420 Robert McClellon,REHS <br /> Fax: (209) 464-0138 .teff Carruesco,REHS,RDI <br /> Kasey Foley,REHS <br /> 30 June 2008 <br /> Messrs. Robert Trommer, CHG, and Kirk Larson, PG <br /> State Water Resources Control Board <br /> Division of Financial Assistance <br /> 1001 1 Street <br /> Sacramento CA 95814 <br /> Subject: Preliminary Five-Year Review Letters <br /> San Joaquin County Environmental Health Department (EHD) has received and <br /> reviewed numerous preliminary five-year review letters each with your request to convey <br /> the EHD's agreement or disagreement with the site-specific recommendations. The EHD <br /> comments for a selection of those sites are provided herein, sites not noted in this letter <br /> will be addressed in the near future. Due to the high volume of preliminary five-year <br /> review letters and the ongoing workload and commitments of the EHD, the following <br /> comments pertain only to the recommendations; other information in the five-year letters <br /> that is incorrect or incomplete is noted only insofar as that information directly affects the <br /> recommendations. <br /> 1901 EI Dorado Street, S. <br /> The State Water Resources Control Board Cleanup Fund Five Year Review <br /> Committee (CUF) recommends that the EHD direct the Responsible Party (RP) <br /> to implement soil vapor extraction (SVE) and assess the efficacy of (insitu) air <br /> sparging (IAS) to achieve Water Quality Objectives (WQOs) more rapidly. The <br /> EHD partially agrees with this recommendation; a significant clay interval in the <br /> area of the water table may impede effective recovery of air and stripped <br /> hydrocarbons from IAS. The consultant has concluded that the site is not suitable <br /> for groundwater extraction (GWE), but has recommended dual phase extraction <br /> (DPE). The EHD has directed submittal of a work plan for a DPE pilot test by 07 <br /> July 2008. <br /> 2404 Pacific Avenue <br /> The CUF recommends that the EHD direct the RP to assess the efficacy of the <br /> current groundwater treatment system and modify it as necessary to achieve <br /> WQOs in a timely manner. The SVE/IAS operation was terminated in November <br /> 2006 by the consultant; dissolved contaminant concentrations rebounded after <br /> five months of non-operation. The EHD directed rebound testing, the consultant <br /> disagreed with rebound testing and proposed reinitiating SVE/IAS operation and <br /> installation of additional SVE wells; the EHD is not satisfied with the technical <br /> 5-Year Review Comment Letter 063008.doc <br />