Laserfiche WebLink
' Greer Property <br /> 15634 Steinegul Road September 9, 2000 <br /> Escalon, California Page: I0 <br />' Report of Findings <br /> ■ Given the high levels of Benzene and the presence of MTBE and TBA in the <br />' groundwater underlying this site and the potential for off-site migration, WHF believes <br /> that it is necessary to perform remediation activities as soon as possible to mitigate the <br /> problem <br />' rhe lateral and vertical extent of soil and groundwater contamination had been <br /> ■ After t <br /> defined, it will be necessary to complete a feasibility study to determine the most <br />' effective method of mitigation <br /> ■ To define the vertical extent of soil contamination, WBT recommends the completion <br />' of a single soul boring approxunately 10' to the north of MW-6 to a depth of <br /> approximately 120' or 10' beyond the point at which the PID indicates ND <br />' ■ To define the lateral extent of the groundwater contamination three (3) additional <br /> monitoring wells should be installed One well will be located 50' to the northwest of <br />' VE-3, one will be 50' east of MW-5, and the other well will be located 30' southeast <br /> of MW-9 <br /> 1 <br /> 1 <br /> • <br />