Laserfiche WebLink
Chronology, Ranch Market page 3 <br /> 23569 Santa Fe Rd, Riverbank/Escalon July 2011 <br /> 03/08/2000 Date of the CUF's new claim (#015211) assigned to Huda & Durhim <br /> Gubary as priority"B". <br /> 04/01/2000 Secor Consulting replaces Arrowhead as consultant for the site. <br /> 07/01/2000 Monitoring wells MW-5D, MW-5, and MW-6 through MW-9 installed on <br /> and off-site under EHD permit. <br /> 09/01/2000 Six SVE wells and one IAS well installed at site under CVRWQCB lead <br /> oversight. <br /> 10/01/2000 Secor conducts two day SVE/IAS pilot test on-site. EHD letters continue <br /> to be returned to the EHD as undeliverable. <br /> 12/27/2000 Replacement domestic well installed at Pantoya property under EHD <br /> permit. Well previously designated "DW-2" and was impacted by Ranch <br /> Market's MtBE release. <br /> 01/11/2001 Old Pantoya (adjacent landowner-home) domestic well, "DW-2" properly <br /> destroyed under EHD permit. <br /> 03/26/2001 Date the CVRWQCB approves Secor's March 2, 2001 Final Remediation <br /> Plan (FRP). <br /> 05/13/2002 Date the CVRWQCB approves Secor's Work Plan for Remedial Approach <br /> and Well Installation, dated May 2, 2002. Many additional SVE and ozone <br /> sparge wells installed. <br /> 07/01/2002 Site posted for Public Participation in preparation of FRP. <br /> 10/17/2002 Adrienne Ellsaesser, EHD Public Water Supervisor issues directive letter <br /> notified RP of Ranch Market "CURFFL" well has been exceeded for <br /> nitrates. <br /> 11/18/2002 Adrienne Ellsaesser, EHD Public Water Supervisor issues directive letter <br /> concerning elevated nitrate concentrations in Ranch Market's only <br /> drinking water/market use water well. Replacement well required if store <br /> to be allowed to continue food sales. <br /> 02/05/2003 Date of Secor letter advising new consultant, Geocon Consultanting will <br /> be replacing Secor. <br /> 12/08/2003 Free product gasoline discovered in MW-3. EHD requires immediate <br /> removal and weekly monitoring of MW-3. <br /> 02/26/2004 EHD resumes lead agency status at site as the CVRWQCB changes <br /> policy and advises RPs in correspondence dated this date. <br /> 03/04/2004 US Mail to all three RPs continues to be returned to the EHD with US Mail <br /> notice as "undeliverable". <br />