Laserfiche WebLink
Revised Work Plan For Soil and Groundwater Assessment 13 <br /> Ranch Market,23569 South Santa Fe Road,Riverbank,California Aril 25,2000 <br /> Submit Boring and Well Permits Applications SJCEHD Day 22 <br /> Obtain Well Installation Permits from SJCEHD Day 29 <br /> Mark borings and clear locations Day 35 <br /> Phase 1- Initial Soil Boring and Groundwater Investigation <br /> Drill deep soil borings SB-1 and SB-2 (4 days) Day 45 to 49 <br /> Complete direct push borings GP-1 through GP-3 Day 52 <br /> Prepare Summary Report and Submit to RWQCB and SJCHED Day 73 <br /> Phase 2- Follow-up Soil Boring and Well Installation <br /> Drill and Install Wells MW-5D through MW-9 (3 days) Day 83 to 86 <br /> Conduct monitoring and sampling event Day 90 <br /> Submit PIER to RWQCB and SJCEHD Day 120 <br /> The schedule listed above assumes that the any county encroachment permits and/or access <br /> agreements can be obtained within 21 days of written pre-approval from the S WRCB-UST <br /> Fund and award of the contract to a consulting firm. <br /> Fae:U-CwProlx&Weaml.WKP <br />