My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008335
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SANTA FE
>
23569
>
2900 - Site Mitigation Program
>
PR0541936
>
ARCHIVED REPORTS_XR0008335
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2020 12:39:58 PM
Creation date
5/18/2020 11:07:23 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008335
RECORD_ID
PR0541936
PE
2957
FACILITY_ID
FA0006149
FACILITY_NAME
RANCH MARKET
STREET_NUMBER
23569
Direction
S
STREET_NAME
SANTA FE
STREET_TYPE
RD
City
RIVERBANK
Zip
95376
CURRENT_STATUS
02
SITE_LOCATION
23569 S SANTA FE RD
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
On July 13, October 19, November 4, and December 2, the ozone flow meter was registering no <br /> flow. The ozone lines were fouled with a white precipitate. The lines and associated valves were <br /> dismantled and cleaned. The ozone lines were re-assembled and the sparge system was returned to <br /> service the same day. Historical operational data including well open/closed status, ozone leak <br /> detection monitoring data, and presence of an odor are presented in Table 6. <br /> 3.3.3 Future Work <br /> Future work planned in the First Quarter 2005 include the following tasks: <br /> • Perform monthly O&M for the ozone sparge system, <br /> • Conduct weekly inspections on the operational status of the catalytic oxidizer and perform <br /> monthly O& M for the SVE system. <br /> 3.4 Geophysical Survey <br /> In accordance with Geocon's Free Product Discovery and Proposed Actions workplan, a <br /> geophysical investigation was performed at the site by Spectrum Geophysics on May 3, 2004. <br /> Spectrum did not discover strong evidence of buried USTs at the site. The Spectrum Results of <br /> Geophysical Investigation report is included as Appendix C.' <br /> 4 <br />{ <br /> i <br /> i <br /> f <br /> Project No.58643-06-01 -9- December 30,2004 <br />
The URL can be used to link to this page
Your browser does not support the video tag.