My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008337
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SANTA FE
>
23569
>
2900 - Site Mitigation Program
>
PR0541936
>
ARCHIVED REPORTS_XR0008337
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2020 11:45:04 AM
Creation date
5/18/2020 11:09:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008337
RECORD_ID
PR0541936
PE
2957
FACILITY_ID
FA0006149
FACILITY_NAME
RANCH MARKET
STREET_NUMBER
23569
Direction
S
STREET_NAME
SANTA FE
STREET_TYPE
RD
City
RIVERBANK
Zip
95376
CURRENT_STATUS
02
SITE_LOCATION
23569 S SANTA FE RD
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> 16 S14, and S15 The ozone sparge system operated 100% of the reporting period at maximum <br /> productivity producing approximately 2 5 pounds of ozone per day and delivering at a rate of 8 to 10 <br /> liters per hour Historical operational data including well open/closed status, ozone leak detection <br /> ' monitoring data, and presence of an odor are presented in Table 7 <br /> ' 3 3.3 Future Work <br /> Future work planned in the remainder of the First Quarter 2004 include the following tasks <br /> Conduct monthly sampling of well domestic well DW-1 <br /> 1_ off!, • Perform monthly O&M for the ozone sparge system <br /> `� • Conduct weekly inspections on the operational status of the catalytic oxidizer and perform <br /> ' monthly O & M for the SVE system <br /> • Perform periodic depth measurements and purging of the free product observed in well <br />' MW-3 <br /> • Investigate potential source of free product <br /> 1 Remove and replace damaged sparge, vapor extraction and monitoring well enclosures <br /> 1 <br /> M <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> • <br /> 1 <br /> PrOjeLt No IM43-06-01 -7- February 18 2004 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.