Laserfiche WebLink
1 <br /> 16 S14, and S15 The ozone sparge system operated 100% of the reporting period at maximum <br /> productivity producing approximately 2 5 pounds of ozone per day and delivering at a rate of 8 to 10 <br /> liters per hour Historical operational data including well open/closed status, ozone leak detection <br /> ' monitoring data, and presence of an odor are presented in Table 7 <br /> ' 3 3.3 Future Work <br /> Future work planned in the remainder of the First Quarter 2004 include the following tasks <br /> Conduct monthly sampling of well domestic well DW-1 <br /> 1_ off!, • Perform monthly O&M for the ozone sparge system <br /> `� • Conduct weekly inspections on the operational status of the catalytic oxidizer and perform <br /> ' monthly O & M for the SVE system <br /> • Perform periodic depth measurements and purging of the free product observed in well <br />' MW-3 <br /> • Investigate potential source of free product <br /> 1 Remove and replace damaged sparge, vapor extraction and monitoring well enclosures <br /> 1 <br /> M <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> • <br /> 1 <br /> PrOjeLt No IM43-06-01 -7- February 18 2004 <br /> 1 <br />