Laserfiche WebLink
MTg,E removal data IS <br /> Table S SV Presented in Table 4 A <br /> E welt data, includingSummary of the <br /> Table 6 Graphical open/closed emissions data is <br /> P presentation of TPII status, vacuum, flow presented in <br /> are shown on Fig and 7 g and benzene , and AID data are presented in <br /> Figures 6 mass removal an <br /> A influent and efflue1it vapor respectively Copies <br /> d influent concentration <br /> p of the O&M field data <br /> ple laboratorynotes are included in analytical reports are included in Appendix <br /> As shown rn Figure 6, the Appendix 13 <br /> increase in c SVE system influent concentrations coincident to he stone contaminant <br /> 300_ t concentrations demonstrated a stn <br /> cfin SVE skid Polis higher vacuums and p Of tile 300- <br /> with thermalg cfin SVE skid on June 26 <br /> oxidizer 7'he r greater now rates than the , 2003 The <br /> contaminant concentrations ncreased vacuum and flow previous 500 <br /> resulted in cfin SVE skid <br /> from 790 After July 23, 2003 the vapor Influent cancentratinitia! increase in in <br /> Ppinv and leveled off to an avera fluent <br /> The rn�ass 1einoval ti end fie of 27l ions sharply decreased <br /> of 7)demonstrates that pPmv rn September <br /> mass removal is on through December 2004 <br /> The contaminant concentrations in the vapor, a steady low angle Incline <br /> load the GAC to breakthrough nfluent <br /> g within a (averaging 277 <br /> SVE system "sin months time <br /> Ppinv this period <br /> g GAC as the me of operation Thep � continued to <br /> catalytic oxidizer Ilius abatement media &M costs to 0 <br /> ' Ge°con obtained an exceeds costs to run a Perste the <br /> Valley Air Pollution Control Authors similarly sized thermal <br /> District for to Construct (ATC) <br /> lanuary 7, 2004 the SVE the use ) from the San Joaquin <br /> systerri was shut dawn due to a 300 cfm electric Catalytic <br /> 2004 the 300 SEs bloEv breakthrough oxidizer On <br /> Filter/Westates Carbon ret�eved the two <br /> out with the 300 lah on the GAC, and on January 9 <br /> The 300 EC 2 000-p a SCAT skid On Januar <br /> AT was started ort Januar ound vapor phase carbon vessels y 12' 2004, U S <br /> Second Quarter 2004 report �' l '' 2D44 DetarIs with spent carbon <br /> of the startup will be presented in the <br /> 332 Ozones <br /> Sparge Systeme <br /> A skid-mounted <br /> ozone sparge system <br /> iirJect ozone elite , enclosed in <br /> groundwater throu h 1 a shed within tine remediation co <br /> oil- and offsite 5 g available ozone s <br /> Sparge well 5-20 was not connected to the sparge wells inpolind, can <br /> An ozone meter attached to the ozone s (S-1 through S-19 <br /> parge system manifold and is , located <br /> ozone is detected at Levels parge system skid will shot down tine rernedration <br /> greater than 0 Ql not used <br /> lip to :elect ozone for 10 igreates at pPin within the shed <br /> The ozone infection system if <br /> 100% the maximum Iiif10 Inn ion rate a time into the s manifold is set <br /> the maximum in ection rate sparge wells It can c <br /> (one well at a time}, or all 20 Cycle through 10 <br /> J Approximately 2 5 ells (twowells at <br /> each day at o pounds of ozone ells at a trine) at 50% <br /> ptinntiiri ozoine Production can be II)Jceted into the subsurface <br /> temperatures The ozone Ozone <br /> sparge system is deli Production is variable <br /> mrriute fined to deliver at an a dependent on atmos <br /> approximate rate of pl�errc <br /> 6 liters per <br /> response to the Fourth <br /> Sparge <br /> ;Hells was <br /> v Quarter 2003 groundwater <br /> as reconfigured oil analytical data rise o <br /> October 1 S, 20x,3 to include Penlelosed <br /> all sparge status of the <br /> p ge points except points S13 <br /> i'rolccr No Sk643-OG-(31 <br /> -6- <br /> 'ehruary 18 2004 <br />