My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008339
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SANTA FE
>
23569
>
2900 - Site Mitigation Program
>
PR0541936
>
ARCHIVED REPORTS_XR0008339
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2020 11:52:24 AM
Creation date
5/18/2020 11:13:20 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008339
RECORD_ID
PR0541936
PE
2957
FACILITY_ID
FA0006149
FACILITY_NAME
RANCH MARKET
STREET_NUMBER
23569
Direction
S
STREET_NAME
SANTA FE
STREET_TYPE
RD
City
RIVERBANK
Zip
95376
CURRENT_STATUS
02
SITE_LOCATION
23569 S SANTA FE RD
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> 20 BACKGROUND <br /> May 1991, three underground storage tanks(USTs) were removed from a common tank pit as shown <br /> in the Detailed Site Plan, Figure 3 Strong petroleum hydrocarbon odors and discolored soil were <br /> noted in the tank pit Confirmation soil samples were collected and laboratory analysis of those <br /> samples confirmed the presence of total petroleum hydrocarbons as gasoline (TPHg) Several <br />' subsurface investigations partially defined the extent of impacts in soil and groundwater resulting in <br /> the installation of nine groundwater monitoring wells (MW-I through MW-9) The contaminants of <br /> concern include TPHg, benzene, toluene, ethylbenzene and xylenes (BTEX), methyl tert-butyl ether <br />' (MTBE), tert-butanol (TBA), di-isopropyl ether(DIPE), ethyl tert-butyl ether (ETBE) and tert-amyl <br /> methyl ether (TAME) otherwise known as fuel oxygenate compounds (FOCs), 1,2-dichloroetlnane <br />' (1,2-DCA), and 1,2-dibromoetliane(EDB) <br /> In September 2000, Secor International Incorporated (Secor) began the remedial investigation and <br />' oversaw the installation of six soil vapor extraction (SVE) and one air sparge (AS) wells on or <br /> adjacent to the former tank pit at the Site (Figure 3) Soil samples collected from V-1, V-2, V-3, and <br /> AS-I contained elevated concentrations of BTEX, TPHg, and MTBE <br /> Soil Vapor Extraction &Air Sparge Feasibility Testing <br /> In October 2000, Secor conducted a two-day SVE and AS feasibility test using six SVE wells and <br /> one AS well Based on the test results, the total mass of TPHg and benzene removed during the <br /> SVE/AS feasibility test was 102 pounds and 1 9 pounds, respectively Based on the induced vacuum <br /> response (0 2 inches of water at 40 feet) and the slight rise in groundwater levels in offsetting <br /> monitoring wells, the SVE radius of influence was estimated to be 40 feet Although the air sparging <br /> did not result in an immediate increase in TPHg vapor concentrations, the increase in dissolved <br /> oxygen concentration and slight rise in the water table in offsetting wells indicate a radius of <br /> influence of approximately 30 feet Details related to the feasibility test are presented in Secor's <br /> Problem Assessment Report dated November S, 2000 <br /> Final Remediation Plan <br /> SECOR submitted a Final Remediation Plan (FRP) on March 2, 2001, that was approved by the <br /> California Regional Water Quality Control Board, Central Valley Region, (RWQCB) in a letter <br /> dated March 26, 2001 <br /> Due to an expansion of the remedial objectives, Secor submitted a Work Plan for Remedial <br /> Approach and Well Installation dated May 2, 2002 The RWQCB approved the work plan in a letter <br /> dated May 13, 2002 The final remediation plan includes 10 soil vapor extraction (SVE) wells (V I <br /> through V 10 each approximately 30 feet deep) and 20 ozone-sparge wells (SI through S20, each 43 <br /> . to 45 feet deep) <br /> S8643-06-01 -2- July 25 2003 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.