i <br /> 20 BACKGROUND <br /> May 1991, three underground storage tanks(USTs) were removed from a common tank pit as shown <br /> in the Detailed Site Plan, Figure 3 Strong petroleum hydrocarbon odors and discolored soil were <br /> noted in the tank pit Confirmation soil samples were collected and laboratory analysis of those <br /> samples confirmed the presence of total petroleum hydrocarbons as gasoline (TPHg) Several <br />' subsurface investigations partially defined the extent of impacts in soil and groundwater resulting in <br /> the installation of nine groundwater monitoring wells (MW-I through MW-9) The contaminants of <br /> concern include TPHg, benzene, toluene, ethylbenzene and xylenes (BTEX), methyl tert-butyl ether <br />' (MTBE), tert-butanol (TBA), di-isopropyl ether(DIPE), ethyl tert-butyl ether (ETBE) and tert-amyl <br /> methyl ether (TAME) otherwise known as fuel oxygenate compounds (FOCs), 1,2-dichloroetlnane <br />' (1,2-DCA), and 1,2-dibromoetliane(EDB) <br /> In September 2000, Secor International Incorporated (Secor) began the remedial investigation and <br />' oversaw the installation of six soil vapor extraction (SVE) and one air sparge (AS) wells on or <br /> adjacent to the former tank pit at the Site (Figure 3) Soil samples collected from V-1, V-2, V-3, and <br /> AS-I contained elevated concentrations of BTEX, TPHg, and MTBE <br /> Soil Vapor Extraction &Air Sparge Feasibility Testing <br /> In October 2000, Secor conducted a two-day SVE and AS feasibility test using six SVE wells and <br /> one AS well Based on the test results, the total mass of TPHg and benzene removed during the <br /> SVE/AS feasibility test was 102 pounds and 1 9 pounds, respectively Based on the induced vacuum <br /> response (0 2 inches of water at 40 feet) and the slight rise in groundwater levels in offsetting <br /> monitoring wells, the SVE radius of influence was estimated to be 40 feet Although the air sparging <br /> did not result in an immediate increase in TPHg vapor concentrations, the increase in dissolved <br /> oxygen concentration and slight rise in the water table in offsetting wells indicate a radius of <br /> influence of approximately 30 feet Details related to the feasibility test are presented in Secor's <br /> Problem Assessment Report dated November S, 2000 <br /> Final Remediation Plan <br /> SECOR submitted a Final Remediation Plan (FRP) on March 2, 2001, that was approved by the <br /> California Regional Water Quality Control Board, Central Valley Region, (RWQCB) in a letter <br /> dated March 26, 2001 <br /> Due to an expansion of the remedial objectives, Secor submitted a Work Plan for Remedial <br /> Approach and Well Installation dated May 2, 2002 The RWQCB approved the work plan in a letter <br /> dated May 13, 2002 The final remediation plan includes 10 soil vapor extraction (SVE) wells (V I <br /> through V 10 each approximately 30 feet deep) and 20 ozone-sparge wells (SI through S20, each 43 <br /> . to 45 feet deep) <br /> S8643-06-01 -2- July 25 2003 <br /> 1 <br />