My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008339
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SANTA FE
>
23569
>
2900 - Site Mitigation Program
>
PR0541936
>
ARCHIVED REPORTS_XR0008339
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2020 11:52:24 AM
Creation date
5/18/2020 11:13:20 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008339
RECORD_ID
PR0541936
PE
2957
FACILITY_ID
FA0006149
FACILITY_NAME
RANCH MARKET
STREET_NUMBER
23569
Direction
S
STREET_NAME
SANTA FE
STREET_TYPE
RD
City
RIVERBANK
Zip
95376
CURRENT_STATUS
02
SITE_LOCATION
23569 S SANTA FE RD
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Remedial We11 and S stem Installatoon <br /> The lateral ozone injection lines, soil vapor extraction lines, and remediation compound were <br /> installed following installation of the ozone sparge and SVE wells The location of the remediation <br /> compound is shown on Figure 3 The SVE lines were stubbed up into a manifold in the remediation <br /> compound that were connected to the 500 scfin catalytic oxidizer Soil vapors are pushed by the <br /> vacuum blower though the catalytic oxidizer A thermal chamber fired by natural gas heats the <br /> catalytic oxidizer bed Soil vapor extraction was initiated at the Site on September 26, 2002, under <br /> San Joaquin Valley Air Pollution Control District (SJVAPCD) Authority to Construct number <br />' N-4613-1-0 <br />' The 20 ozone sparge pipes were stubbed up into a manifold and connected to the 6 cfm ozone sparge <br /> slid and ozone generator Ozone sparging was initiated at the Site on November 20, 2002 <br /> Additional details of the remediation well installation and system startup are described in Secor's <br /> Remediation Well and Soil Vapor Extraction System Installation Report, dated November 27, 2002 <br /> Domestic Wells <br /> Four domestic water supply wells (DW-1 through DW-4) and one destroyed donnestic water supply <br />' (DW-2R) well are located within 340 feet of the former tank pit(Figure 2) <br /> Well 4 Location from Tank Pit Comments <br /> DW-1 90 feet west of tank pit Upgradient of tank pit (onsite well) <br />' DW-2 120 feet south of tank pit Downgradient well (well destroyed) <br /> DW-3 245 feet south of tank pit Downgradient of tank pit <br /> DW-4 340 feet south of tank pit Downgradient of tank pit <br /> IDW-2R 200 feet south of tank pit Downgradient of tank pit (well installed <br /> December, 2000 to replace DW-2) <br /> Water samples collected from domestic wells have been analyzed for the presence of BTEX, TPHg, <br /> five oxygenates, 1,2-DCA, and EDB Since water samples collected from DW-2 contained <br /> 1 reportable concentrations of MTBE,the well was taken out of service and replaced with DW-2R <br /> f <br /> I <br /> 1 <br /> 58643-06-01 -3- July 25 2003 <br />
The URL can be used to link to this page
Your browser does not support the video tag.