Laserfiche WebLink
Cone Penetrometer Assessment Report 5 <br /> Ranch Market,23569 South Santa Fe Road,Riverbank Califomia November 20,2001 <br /> I <br /> I <br /> amounts of clay The lithology is interbedded with silt, clay, and sand as follows generally <br /> sandy silt between grade and 10 feet bgs, silty sand and sand to 20 feet bgs, silt and clayey silt <br /> to 32 feet bgs, and interbedded sands, gravelly sands, and silts to 75 feet bgs No obvious low <br /> permeability, confining layer of clay or silty clay was observed in the continuous core samples <br /> collected from soil borings SB-1 or SB-2 Cross sections with the CPT borings are presented in <br /> Figures 5 and 6 <br /> SCOPE OF WORK <br /> Site Specific Health and Safety Plan, Permitting, and Utility Clearance <br /> SECOR used the existing site-specific Health and Safety Plan to cover the activities proposed <br /> at the Site as required by the Occupational Health and Safety Administration (OSHA) Standard <br /> "Hazardous Waste Operations and Emergency Response" guidelines (29 CFR 1910 120) The <br /> document was reviewed and signed by all SECOR personnel and subcontractors performing <br /> work at the Site <br /> Permits for soil borings were obtained from the SJCEHD (Attachment 3) Existing access <br /> agreements were used for drilling on private property An encroachment permit was obtained <br /> • from San Joaquin County Public Works Department for CPT-3, located within the public right- <br /> of-way <br /> Prior to conducting subsurface work at the Site, Underground Service Alert (USA) was <br /> contacted to delineate subsurface piping near the Site with surface markings <br /> SITE ASSESSMENT <br /> Cone Penetrometer Testing and Vertical Water Sample Collection <br /> On October 12, 2001, SECOR supervised the drilling of soil borings CPT-1 to approximately <br /> 42 feet bgs, CPT-2 to 40 feet bgs, and CPT-3 to 65 feet bgs, using a CPT ng (Figure 2) CPT-1 <br /> and CPT-2 were each proposed to be drilled to 65 feet bgs, but met refusal at approximately 40 <br /> feet bgs Due to dnll rig refusal at 40 feet bgs in CPT-2, boring CPT-2A was advanced to <br /> approximately 76 feet bgs (Field Notes, Attachment 4) A summary of proposed water sample <br /> collection depths and actual sample depths are summarized in the table below <br /> Pile Ranch Market\Reports\Rb-CPT install <br />