Laserfiche WebLink
Final Rernediation Plan Page 15 <br /> Ranch Market 23569 South Santa Fe Road Riverbank CA February 28 2001 <br /> I • San Joaquin Valley Air Pollution Control District (SJVAPCD)Authority to Construct <br /> Permit for the installation of the catalytic oxidizer Following installation of the vapor <br /> abatement equipment, the SJVAPCD will inspect the system and observe the <br /> collection of a vapor sample to confirm the destruction efficiency of the vapor <br /> abatement equipment The Permit to Operate will be submitted to the SJVAPCD with <br /> the start-up vapor sample analytical data for final approval to operate the system <br /> Additional permits may be required to complete installation and start-up of the system <br /> 6.3 Pre-Construction Activities <br /> The construction bid package will be distributed to a minimum of three qualified contractors <br /> with experience performing similar projects A bid walk will be performed to allow potential ' <br /> contractors to view the Site and direct questions to the design engineer regarding construction <br /> specifications Competitive bids will be procured from the qualified contractors and the client <br /> will select a contractor based on the contractors' capabilities to perform the work and their <br /> submitted bid cost <br /> Process equipment will be procured prior to construction based on the specifications prepared <br /> during the design phase Equipment delivery will be coordinated to meet the construction <br /> scheduling needs of the selected contractor <br /> 6.4 Construction Activities <br /> 6.4.1 Remediation Well Installation <br /> SVE wells will be installed prior to system construction A Remediation Well Installation <br /> Work Plan will be prepared and submitted to the RWQCB and SJCEHD for approval prior to <br /> well installation activities Well installation permits will also be obtained from the SJCEHD <br /> prior to well installation activities <br /> 6.4.2 Remediation System Installation <br /> The remediation system construction will commence upon procurement of all system <br /> construction and operation permits, completion of pre-field activities, and completion of well <br /> installation activities The client's representative will provide construction management during <br /> construction activities This includes on-site management of contractor and subcontract <br /> personnel An experienced representative will be present to document Site activities using <br /> daily logs and photographic documentation The representative will verify compliance with <br /> design drawings, construction specifications, building permits, the Site Health and Safety <br /> Plan, and construction schedules The representative will also maintain revisions to a fob-copy <br /> of the design drawings for preparation of the final as-built drawings of the system <br /> 6.4.3 Waste Characterization and Disposal <br /> C Waste materials will be generated from the borings for the remediation wells and the <br /> excavation of the conveyance trenches Wastewater will be generated from steam cleaning of <br /> drill augers during well installation and from development of the remediation wells Waste <br /> File FRP-report doc SECOR International Incorporated <br />