Laserfiche WebLink
• 6 4 1 Remediation Well Installation 15 <br /> 642 Remediation System Installation 15 <br /> 643 Waste Characterization and Disposal 15 <br /> 65 Remediation System Troubleshooting and Start-up 16 <br /> 66 Remediation System O&M, Monitoring, and Reporting 16 <br /> 6 6 1 Remediation System O&M 16 <br /> 662 Groundwater Monitoring 16 <br /> 7.0 CONCLUSIONS .............................................................................................................17 <br /> LIST OF FIGURES <br /> Figure 1 — Site Location Map <br /> Figure 2 — Site Plan <br /> Figure 3 —Detailed Site Plan <br /> Figure 4 —Geologic Cross-Section Location Map <br /> Figure 5 —Geologic Cross-Section A to A' <br /> Figure 6 —Geologic Cross-Section B to B' <br /> Figure 7 —Groundwater Elevation Contour Map <br /> Figure 8 — Sensitive Receptor Survey Map <br /> Figure 9— Soil Sample Data Map <br /> Figure 10—Groundwater Analytical Results Map <br /> Figure 11 — Soil Vapor Extraction Radius of Influence and Proposed SVE/OS System Layout <br /> LIST OF TABLES <br /> Table 1 —Historical Soil Sample Analytical Results <br /> Table 2—Soil Boring and Well Construction Details <br /> Table 3 —Mstoncal Groundwater Monitoring and Analytical Data <br /> Table 4 —Sensitive Receptor Survey Results <br /> Table 5 --SVE/AS Dissolved Oxygen and Depth to Water Measurements <br /> Table 6 —Soil Vapor Extraction/Air Sparge Monitoring Data <br /> Table 7 —SVE/AS Laboratory Analytical Results <br /> Table 8 — SVE/AS Mass Removal Rates <br /> Table 9—Proposed Well and Soil Boring Completions <br /> LIST OF APPENDICES <br /> APPENDIX A —Drilling Logs and Well Construction Specifications <br /> APPENDIX B —Hydrocarbon Mass Estimates and Assumptions <br /> APPENDIX C — Remediation Feasibility Matrix <br /> APPENDIX D —Ozone Infection System Specifications <br /> File RB FRP Report doc it SECOR International Incorporated <br />